H051<br />

PR/MRWSA Reg Integ Loop Sys Phase 2 Interconnect<br />

The Authority's consultant released a technical memorandum which updated the cost estimate from the 2007<br />

Preliminary Design report. The cost for a 36-inch diameter, 5.5 mile long pipeline with a transmission capacity of 13.5<br />

mgd was updated from $12,000,000 to $15,400,000.<br />

The project is scheduled for completion by September 2012. The City is currently exceeding their 1.192 mgd annual<br />

average capacity entitlement in the existing pipeline from the Peace River Facility. The City will require an additional<br />

1.758 mgd transmission capacity by 2011, and a total of 3.20 mgd transmission capacity by 2014.<br />

The City of North Port, Charlotte County, and the Authority entered into a three party temporary interlocal agreement<br />

for the capacity use of existing water main. The City and County approved the agreement on May 26, 2009, and the<br />

Authority board approved the agreement on June 3, 2009. This agreement will allow the City of North Port additional<br />

capacity until September 30, 2012, which is the scheduled completion date for the Phase 2 interconnect. Also on May<br />

26, 2009, The City of North Port approved the interlocal agreement for the Phase 2 interconnect. The agreement was<br />

approved at the Authority Board meeting on June 3, 2009.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,200 (3,200) 0 1,501,785 2,750,000 4,251,785<br />

020 Peace River Basin 2,001 (2,001) 0 200,860 742,500 943,360<br />

0<strong>21</strong> Manasota Basin 2,001 (2,001) 0 501,913 2,007,500 2,509,413<br />

Project Funds Not Budgeted by the<br />

District<br />

PRMRWSA 0 0 600,000 2,200,000 4,900,000 7,700,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,404,558<br />

Critical Project Milestones Projected Amended Actual<br />

Permitting / Property aquisition 5/29/09<br />

Design 11/27/09<br />

Construction 12/31/<strong>10</strong><br />

Status As Of: August 31, 2009<br />

The Authority executed Work Order No. 2 with King Engineering Associates (King) on September 2nd, 2009 for the<br />

project coordination, BODR, final design, permitting, and bidding award services of the Phase 2 Interconnect. King was<br />

intially contracted in June 2007 for the project.<br />

Accelerate Florida: The Authority has been notified of the Accelerate Florida Program. This project will be shovel-ready<br />

December 20<strong>10</strong>.<br />

020 - Peace River Basin 203