L671<br />

Polk County Aquifer Recharge Project to Relieve Flooding and<br />

Augment GW Supplies<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

134,856 0 4,491 6,293<br />

020 Peace River Basin 660,000 805,640<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County 125,000 0 0 32,500<br />

0 157,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$963,140<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Development<br />

Governing Board Approval 9/26/06 9/26/06<br />

1st Draft SOW Submitted 9/27/06 9/27/06<br />

2nd Draft SOW Submitted <strong>10</strong>/25/06 <strong>10</strong>/25/06<br />

3rd Draft SOW Submitted 1/16/07 1/16/07<br />

Execute Contract 7/11/07 7/11/07<br />

MSA between County and Ardaman Signed 8/29/07 8/29/07<br />

Feasibility Study<br />

Complete Wells (2) and Monitor Wells Installation 8/11/07 11/30/08 6/30/09<br />

Surficial Aquifer Performance Test <strong>10</strong>/11/07 9/18/09<br />

Complete WQ and Data Collection; Interpretation/Analysis <strong>10</strong>/11/08 <strong>10</strong>/30/<strong>10</strong><br />

Report Preparation and Review 2/11/09 3/31/11<br />

Complete Upper Floridan Aquifer Monitor Wells Installation (2) 2/11/09 12/30/<strong>10</strong><br />

Contract Close-out 9/30/09 9/30/11<br />

Status As Of: August 28, 2009<br />

County facilities staff have installed the electrical poles and panels at both sites and connected power. The preliminary<br />

sediment and hydrological analyses were completed and written reports were provided. The data was evaluated to<br />

develop well construction specifications. Drilling was completed at both the Lake Gwyn and Cypresswood sites. A<br />

step-drawdown test was completed on March 11, 2009 at the Cypresswood site to determine specific capacity and well<br />

efficiency, which was used to estimate the required pump size for the well. Progress was delayed, because the water<br />

from the Lake Gwyn site well was turbid and required additional development before the pump could be installed. Pump<br />

installations are now complete and sampling commenced on August 19, 2009 at both sites. The project manager<br />

received the third invoice on June 8, 2009 and has noted issues that are currently being addressed with the cooperator.<br />

ACTION-TO-DATE: Delayed. The project has been delayed as noted in the status above. In addition, the Upper Floridan<br />

aquifer wells will not be installed until 12 months of sampling have been completed on the test wells that have already<br />

been installed, and there is reasonable assurance that this project will be permitted. An information request concerning<br />

the Accelerate Florida Program was mailed to the cooperator on October 15, 2008. The District's project manger<br />

followed up with emails on January 16, 2009, February 9, 2009, and February 19, 2009 and multiple phone calls to<br />

request a response to the letter. The County responded with the following email, dated February 25, 2009: "All activities<br />

will be accelerated to the highest extent possible. All wells have been developed satisfactorily at the Cypresswood site,<br />

however further development is necessary at the Lake Gwyn site. Rather than wait for wells at both sites to be developed<br />

before proceeding, we will move forward with capacity testing at Cypresswood, then groundwater sampling once pumps<br />

are set. We will continue to develop the wells at Lake Gwyn and proceed once that is accomplished. The sampling<br />

schedules will be staggered, but it will accelerate activities at Cypresswood. Groundwater sampling turn-around times will<br />

be maximized, as will reporting of those results."<br />

020 - Peace River Basin 281