L153<br />

Lake Placid Reuse<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Lake Placid<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This alternative water supply project includes the design and construction of a reclaimed water pump station and a<br />

500,000-gallon capacity reclaimed water ground storage tank located at the town wastewater treatment facility<br />

(WWTF) site, and approximately 6,446 linear feet of <strong>10</strong>-inch, 8-inch, and 6-inch diameter reclaimed water<br />

transmission main.<br />

Benefits<br />

This project will provide approximately 91,000 gallons per day of reuse to the Town of Lake Placid to irrigate town<br />

parks and recreation facilities (81,000 gpd)(WUP # 9494) and citrus groves owned by Bob Paul, Inc. (<strong>10</strong>,000 gpd)<br />

(WUP # <strong>10</strong>077). The project will offset approximately 55,000 gpd of groundwater use currently used by these<br />

properties for irrigation purposes.<br />

Costs<br />

The Peace River Basin's total contribution, requested by the Town of Lake Placid, is based on Rural Economic<br />

Development Initiative (REDI) consideration. The total estimated project cost is $1,374,200, with the Peace River<br />

Basin's share not to exceed $962,574, and the Town's share not to exceed $411,626. This funding contribution ratio<br />

represents a 67.5 percent / 32.5 percent District/Town split, as approved by the Peace River Basin Board. The Peace<br />

River Basin included $<strong>10</strong>0,000 for this project in its FY2004 budget and $414,030 in its FY2005 budget. The Town<br />

requested that the Peace River Basin include $414,030 in its FY2006 budget. However, funds in the amount of<br />

$117,420 were allocated from the Water Protection and Sustainability Trust Fund Program, changing the amount in<br />

FY2006 budgeted by the Peace River Basin to $448,544.<br />

Additional Information<br />

The town has also indicated it is pursuing additional reuse customers that may be served in the future. Of the total<br />

project cost of $1,374,200, approximately 90 percent ($1,234,200) is expected to be needed for construction, and the<br />

remainder ($140,000) for design and administration.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 849,554 0 1,299 8<strong>10</strong><br />

0 851,663<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

117,420 0 0<br />

0<br />

0<br />

117,420<br />

Project Funds Not Budgeted by the<br />

District<br />

Town of Lake Placid 411,626 0 0<br />

0<br />

0 411,626<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,380,709<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contracts Administration 7/12/04 9/17/04<br />

Draft Agreement Returned from Contracts Administration 8/12/04 11/<strong>10</strong>/04<br />

020 - Peace River Basin 253