N075<br />

City of Winter Haven Northern Reuse Service Area Reclaimed Main<br />

Extension<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is an alternative water supply project in the northern reuse service area that involves the design and construction<br />

of approximately <strong>21</strong>,600 linear feet of reclaimed water transmission main ranging in diameter from 8 to 12 inches and<br />

necessary appurtenances. The project will connect various developments (Hampton Cove, Lakes at Lucerne Park,<br />

Sunset Hills, Royal Hills, Lake Henry Isles, etc.) throughout the northern reuse service area along Buckeye Road,<br />

Conine Drive, Lucerne Park Road, US 17, Havendale Boulevard, and Country Club Road. In all, the project area<br />

includes 2,019 potential customers. The City anticipates a 75% (1,514 hook-ups) connection rate.<br />

Benefits<br />

The project will provide .908 mgd of reclaimed water to 1,514 customers, offsetting 0.454 mgd of traditional<br />

groundwater supply.<br />

Costs<br />

The total cost of this project is estimated to be $2,204,000, of which the Peace River Basin is requested to fund 50<br />

percent, or $1,<strong>10</strong>2,000. Funding in the amount of $320,328 has been budgeted in FY2009 (of which 120,328 has been<br />

transferred and allocated from the Water Protection and Sustainability Trust Fund) and $225,000 has been budgeted<br />

in FY20<strong>10</strong>. It is expected that Winter Haven will request $616,836 in future years for this multi-year project. The<br />

cost-benefit is $1.17/1,000 gallons, amortized over 30 years at eight percent interest. The future funds identified for the<br />

project are contingent upon approval of such amounts by the District Governing and Basin Boards in the annual<br />

budget(s).<br />

Additional Information<br />

The effluent from the City's Plant 2 WWTP is identified as the source for the project. Currently, reclaimed water is<br />

being used for irrigating golf courses, cemeteries, residential developments and numerous parks. The city requires<br />

new development to install the internal reclaimed water distribution mains and dedicate them to the City, so that when<br />

reclaimed water mains are extended in the location of these developments, they can be connected to the city. The<br />

project is expected to take approximately two years to complete and has been identified as a potential project in the<br />

City's reuse mater plan. Of the total project cost of $2,204,000, approximately 94 percent ($2,075,000) is expected to<br />

be needed for construction, and the remainder ($129,000) for design and administration. The project offsets are<br />

related to WUP #4607.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 203,348 227,691 616,836 1,047,875<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 120,328 0<br />

0<br />

0<br />

120,328<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 0 0 1,<strong>10</strong>2,000<br />

0<br />

0 1,<strong>10</strong>2,000<br />

020 - Peace River Basin 334<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,270,203