N074<br />

Winter Haven Toilet Rebate Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The City of Winter Haven has proposed a water fixture retrofit project to offer incentives for water efficient fixtures,<br />

including low flow toilets and retrofit kits. This project will target the replacement of approximately 1,000 conventional<br />

toilets with low-flow toilets, which use up to 1.6 gallons per flush (gpf). Rebates of up to $<strong>10</strong>0 will be offered to<br />

single and multi-family customers (maximum two per customer) that replace an older high water use toilet with a low<br />

flow toilet. Single-family customers can replace up to two toilets per household, while multi-family establishments will<br />

be encouraged to replace all toilets at one time. All toilets will be inspected by the City of Winter Haven. At the time of<br />

inspection, the customer will be provided with a water conservation kit, which includes low flow showerheads and<br />

faucet aerators, along with educational materials on leak detection and proper flapper replacement specific to the<br />

make and model of the low-volume toilet.<br />

Benefits<br />

This project is anticipated to save an estimated 24,175 gallons of water per day. The various devices to be installed for<br />

this project have different life spans, and so the estimated water savings was calculated using a weighted average<br />

based on the total benefit for the life of the project.<br />

Costs<br />

The total project cost is $<strong>10</strong>7,500, and the Peace River Basin Board approved funding in the amount of $53,750 in<br />

FY2009. The cost amortized at 8 percent over 20 years, is $1.22 per thousand gallons saved (calculated using a<br />

weighted average based on the total benefit for the life of the project).<br />

Additional Information<br />

There are approximately 18,384 single family residences in the City of Winter Haven, which are all eligible participants<br />

for the project. The project is proposing to provide low-flow toilets to 1,000 of those homes.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 55,684<br />

0<br />

0 55,684<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 0 0 53,750<br />

0<br />

0 53,750<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$<strong>10</strong>9,434<br />

Critical Project Milestones Projected Amended Actual<br />

Draft Agreement to Contracts Administration <strong>10</strong>/31/08 11/24/08<br />

Draft Agreement returned from Contracts Administration 11/30/08 12/4/08<br />

Contract Executed 12/31/08 2/19/09<br />

Notice to Proceed 1/30/09 2/24/09<br />

Rebates Commence 3/28/09 2/24/09<br />

Rebates Complete 4/1/<strong>10</strong><br />

Contract Termination 12/31/11<br />

020 - Peace River Basin 332