N188<br />

City of Bradenton NAVD88 Vertical Control Densification<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager OWENS, JIM<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The establishment of an accurate and easily accessible vertical control survey network is an important component in<br />

the development of updated Federal Emergency Management Agency Flood Insurance Rate Maps (FEMA FIRM). The<br />

District, in cooperation with the National Geodetic Survey and the Florida Department of Environmental Protection, has<br />

completed the Distict-wide vertical control densification. This project will further enhance the existing vertical control<br />

network to support FEMA FIRM mapping, topographic data collection and modeling activities. The newly-established<br />

vertical control network will allow the District and local governments to transition from the older and less accurate<br />

vertical control survey network known as the National Geodetic Vertical Datum of 1929 to the more accurate North<br />

American Vertical Datum of 1988 (NAVD88) system. In the City of Bradenton this includes running level loops and<br />

establishing bench marks based on NAVD88 along city roadways. This project will enable the surveying community to<br />

make an orderly transition to NAVD88 and will allow the City of Bradenton to be on the same vertical datum as the<br />

District and to comply with the federal surveying and mapping requirements. This project will densify the NAVD88<br />

vertical control in the City of Bradenton and will compliment the District's NAVD88 migration project. The City of<br />

Bradenton will coordinate all vertical control surveying with Manatee County (N151).<br />

Benefits<br />

Densification of benchmarks will support the development of Watershed Management Plans for Polk County thus<br />

contributing to flood protection, natural systems, water quality and water supply. The City of Bradenton participates in<br />

the National Flood Insurance Program administered by FEMA and requires that all finished floor elevations be above<br />

the <strong>10</strong>0 year floodplain. This project is a key component in meeting this requirement. Also, the establishment and<br />

implementation of the NAVD 1988 will enable more accurate elevations and mapping throughout the District, and the<br />

conversion to the modern vertical datum will allow the ability to establish accurate and reliable elevations using Global<br />

Positioning System (GPS) technology.<br />

Costs<br />

Total cost for contractual services in FY20<strong>10</strong> is $136,600 of which the District's share is $68,300. The City of<br />

Bradenton will contribute $68,300. The District's share of funding for this project is within the Manasota Basin.<br />

Additional costs are associated with staff time required to manage the project.<br />

Additional Information<br />

This project will be administered by the City of Bradenton. The vertical control network survey work will be completed<br />

by qualified professional surveying and mapping consultants. All newly-established vertical control network data<br />

produced by this project will be made available through Internet access via LABINS web site and the Manatee County<br />

web site.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 0 70,249<br />

0 70,249<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 0 0 0 68,300<br />

0 68,300<br />

0<strong>21</strong> - Manasota Basin 358<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$138,549