L693<br />

Water Exhibits in the Glazer Children's Museum of Tampa<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

The Children's Museum of Tampa<br />

Project Manager HULL, MARY MARGARET<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The Glazer Children's Museum of Tampa is relocating to a new museum site in Riverfront Park in downtown Tampa.<br />

This multi-year project is part of the City of Tampa's efforts to revitalize the downtown business district. This is the third<br />

and final phase of a project to develop and install water exhibits in the museum. In FY2007, the District funded the<br />

planning and development phase for interactive water exhibits. FY2008 funds paid for detailed specifications,<br />

structural engineering, fabrication of support structure, construction of entrances, partial platform construction and<br />

other expenses related to fabrication. In the conceptual phase, District staff and BBEC members were included in<br />

several planning sessions for the design of the interactive water exhibits to ensure they incorporate the District's<br />

message. These exhibits include Water's Journey, which is a three-story climbing structure where visitors "become" a<br />

drop of water and make their way across the watershed, down through the aquifer, up to the city, down a storm drain<br />

and into a swamp. Another exhibit is the Water Bank, which is styled to look like an ATM. Here visitors explore some<br />

of the issues of water supply and demand. Sample depositors of water into the ATM are rain, reservoir, desalination<br />

plants, etc. Withdrawals of water are made by wildlife, wetlands, cities, people, industry, agriculture, etc. Interest is<br />

earned by saving water through a variety of water conservation actions, such as turning the water off when brushing<br />

teeth, using Florida-Friendly LandscapingTM principles, etc. The FY2009 funding is for exhibit construction and<br />

installation.The museum is scheduled to open to the public in May/June 20<strong>10</strong>.<br />

Benefits<br />

The exhibits are multidisciplinary and designed to engage diverse learning styles. The museum is projected to draw<br />

<strong>10</strong>0,000 people annually. The interactive water exhibits address three elements of the District's AORs -- water supply,<br />

water quality and natural systems -- in simple, easy-to-understand terms. Additionally, this project targets children ages<br />

0-<strong>10</strong> years and accompanying adults. This segment of the population was identified in an independent evaluation of<br />

the District's youth education program as one to which the District needed to expand its reach. This project helps<br />

accomplish this goal.<br />

Costs<br />

The total cost of the project (including building construction and all exhibits throughout the museum) is estimated to be<br />

$20 million. The total contribution from the District, including FY2007, FY2008 and FY2009, is $617,442. In FY2007,<br />

the basins shared $112,500 for the planning and development phase for interactive water exhibits. FY2008 funds were<br />

for detailed specifications, structural engineering, fabrication of support structure, construction of entrances, partial<br />

platform construction and other expenses related to fabrication. FY2009 funds are for completion of the exhibit<br />

fabrication, installation and education program development. Phase 3 FY2009 funding request of $252,471 is<br />

allocated as follows:<br />

Alafia River: 12% $29,968;<br />

Hillsborough River: 27% $68,900;<br />

Northwest Hillsborough: 15% $37,340;<br />

Coastal Rivers: 9% $22,249;<br />

Pinellas-Anclote: 14% $35,396;<br />

Withlacoochee River: 5% $12,8<strong>21</strong>;<br />

Peace River: 8% $20,550;<br />

Manasota: <strong>10</strong>% $25,247.<br />

The funding splits for this project are based on cooperator-supplied projections of museum attendance. This project<br />

anticipates reaching <strong>10</strong>0,000 people per year at a cost (for the total project, all phases) to the District of $6.18 per<br />

person. Typical museum exhibits have a <strong>10</strong>-year life span. This project, therefore, has the potential to reach 1 million<br />

visitors over a <strong>10</strong>-year period at a cost to the District of $0.62 per person. The budget lines below include costs for<br />

staff to manage the project.<br />

020 - Peace River Basin 294