B092<br />

USGS-Flatford Swamp Surface Water Monitoring Program<br />

Project Initiated 12/<strong>10</strong>/98 12/<strong>10</strong>/98<br />

Status As Of: August 31, 2009<br />

Collected stage data and serviced streamflow gages during regularly scheduled field trips. Station levels were run at<br />

Flatfor Swamp (02298494) to rectify minor discrepencies. No datum corrections were need to any prior year data. USGS<br />

will continue to monitor all sites via satelite transmission for problems that need immediate attention and correction.<br />

.Data for the 2008 water year have been reviewed and published at http://wdr.water.usgs.gov/ Safety rails were added to<br />

all gages in the Flatford network to comply with OSHA standards. New shaft encoder was installed at Long Creek as the<br />

old one malfunctioned and failed to provide data to be transmitted.<br />

0<strong>21</strong> - Manasota Basin 125