H088<br />

Dona Bay Water Supply Development and Management Project<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

HEYL, MIKE<br />

Status Ongoing<br />

Description<br />

This cooperative funding application proposes a multi-phase implementation plan for the Dona Bay Watershed<br />

Management Plan (DBWMP), previously cooperatively funded by the basin under L493. The project proposes to divert,<br />

store and transport excess freshwater flows from Cow Pen Slough prior to discharging them into the Dona Bay Estuary<br />

providing an alternative water supply in the SWUCA as well as environmental benefits to the bay. The water would be<br />

ultimately transported to the County's Carlton Facility for treatment and distribution. The potential capacity is estimated<br />

in 3, 5, <strong>10</strong>, and 15 mgd phases. The DBWMP was finalized in June 2007, and as design has progressed, the<br />

implementation plan has evolved. The project covers initial elements including design, permitting and construction for<br />

a new weir structure in the Cow Pen Slough canal near the historic ridge line, the phased adaptation of the Venice<br />

Minerals site to a reservoir (first 3 mgd), a conveyance system from the proposed weir to join the future Venice<br />

Minerals site, the West Pinelands wetlands restoration, and a pilot treatment study to determine the most efficent and<br />

effective way to treat surface and groundwater in that area. Because of uncertainties such as water supply demands,<br />

the Albritton reservoir that is part of future phases is not included in the project at this time. Certain initial project<br />

components will be sized to accommodate the increased capacities once Albritton is brought online. The County,<br />

District and Authority staff are working through several funding issues such as Authority involvement in the project,<br />

and the most suitable water treatment system for the project through the Dona Bay Work Group. Currently the MOU<br />

between the County and Authority agreeing to work together to develop a Dona Bay Project agreement is scheduled to<br />

go before County and Authority Boards for approval in July 2009.<br />

Benefits<br />

The objective is to decrease excess freshwater flows to Dona Bay. The elements listed in the FY20<strong>10</strong> application, the<br />

new weir, West Pinelands mitigation area, conveyance to the future Venice Minerals reservoir and initial adaptation of<br />

the Venice Minerals site could increase the watershed hydro period and storage capacity. The County has been<br />

working with District staff and has provided an estimate of approximately 5 tons/yr of nitrogen removed from the bay if<br />

Venice Minerals is used as a retention pond and an additional 9 tons/yr of nitrogen removal if surface water is utilized<br />

for water supply. If the pilot test proposed in phase 1 of the project determines intermediate groundwater is the most<br />

effective source for the intial 3-5 mgd, the environmental benefits to the Bay from this withdrawal will not be realized .<br />

Costs<br />

The request for FY20<strong>10</strong> funding of $1,800,000 would be split between the Governing Board for $900,000, the Peace<br />

River Basin Board for $243,000 and the Manasota Board $657,000. The County has already begun design\permitting<br />

for West Pinelands restoration, the new weir in Cow Pen Slough, phased modifications of the Venice Minerals mine to<br />

a reservoir, and the conveyance from the new weir to Venice Minerals. These FY20<strong>10</strong> funds would be used to finish<br />

design\permit tasks not started in FY2009 and\or begin initial work such as area excavation for the modification of<br />

Venice Minerals. Another option discussed at the Dona Bay Work Group was to proceed with the pilot treatment test<br />

as a partnership between the Authority and the County. The total project cost is estimated at approximately $53<br />

million at this time. The District share is requested to be 50 percent, or approximately $26.5 million. As previously<br />

mentioned, the County and Authority continue to discuss options for sharing the water from this project regionally. If an<br />

agreement can be reached that meets the intent of District Policy 130-4, then Governing Board funding may be<br />

available for the project.<br />

Additional Information<br />

The current Dona Bay watershed has been significantly impacted by man-made drainage activities, which increased<br />

the efficiency and volume of freshwater being discharged to its tidal estuary. In addition, historical maps indicate that a<br />

significant portion of the current watershed may have been diverted to Dona Bay by the man-made Cow Pen Slough<br />

canal. Towards this outcome, Sarasota County has acquired lands that are strategically located in the watershed and<br />

initiated monitoring of freshwater flows to, and natural system and water quality indicators in, the tidal portions of Dona<br />

Bay. The Dona Bay Watershed Management Plan (DBWMP) (L493) was cooperatively funded during FY2006 and<br />

FY2007 as a comprehensive watershed plan for the Dona Bay watershed.<br />

0<strong>21</strong> - Manasota Basin 238