10.12.2012 Views

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

L867<br />

Sarasota County GIS Dataset Development<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager FITOS, EKATERINA<br />

Task Manager(s)<br />

Status Ongoing<br />

TURNER, DAWN, DICKS, STEVE, FITOS, EKATERINA<br />

Description<br />

Sarasota County Environmental Services is creating and maintaining a comprehensive Geographic Information<br />

System (GIS) database to support surface water modeling and stormwater asset management functions. This project<br />

enhances the quality of the data supporting modeling activities by gathering accurate locations and characteristics of<br />

key stormwater assets. Among many potential applications, these data will aid in the development and management of<br />

watershed management plans through hydrologic model maintenance/updates and point and non-point pollutant<br />

source identification. The funding will be used to enhance the County's current stormwater infrastructure database that<br />

consists of control structures, inlets, pipes, pipelines, ditches, swales and retention/detention ponds. These data will be<br />

used by the County to generate and maintain a common database that will support water quality, hydrologic and<br />

hydraulic models. This database will also be compatible with the District's GIS database standards.<br />

Benefits<br />

Drainage infrastructure is a critical component in the calibration and verification of hydrologic and hydraulic models.<br />

When fully calibrated, these models generate accurate stage-area relationships, allowing County staff to generate<br />

precise floodplain maps needed to estimate flood risks. When paired with topographic data, Sarasota County will be<br />

able to move ahead with Federal Emergency Management Agency Map Modernization efforts. The improved database<br />

will allow the County to initiate proactive flood protection measures that include the rapid assessment and identification<br />

of potential flooding hot spots, and development of complex what-if scenarios. The database will also support water<br />

quality management efforts and to ensure fishable and swimable waters. County staff will be better equipped to identify<br />

and model key water monitoring locations within coastal watersheds.<br />

Costs<br />

Costs for FY2009 include $<strong>10</strong>0,000 from the Manasota Basin Board and $150,000 from Sarasota County. The cost of<br />

the project through FY2008 is $306,742. The Manasota Basin Board is contributing $<strong>10</strong>0,000 and Sarasota County is<br />

$206,742.<br />

Additional Information<br />

As part of the hydrologic model and for the purposes of this project, horizontal survey data collection refers to<br />

structures such as pump stations, weirs, ponds and wetlands which combine to form part of a drainage infrastructure.<br />

By collecting this information through the means of a horizontal survey the data can be used for more accurate<br />

modeling in the event of severe weather impacts or for planning purposes due to urbanization.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin <strong>10</strong>1,278 0 <strong>10</strong>1,420 <strong>10</strong>2,727 200,000 505,425<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 306,742 0 200,000 200,000 500,000 1,206,742<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,712,167<br />

Critical Project Milestones Projected Amended Actual<br />

Phase 2 - FY 2008<br />

Contract Execution 12/19/07 9/15/08 9/5/08<br />

0<strong>21</strong> - Manasota Basin 316

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!