B198<br />

Lake Jackson MFL Recovery Feasibility Study<br />

project scope of work with a reduction in the watershed evaluation tasks. These tasks were no longer needed since the<br />

information and data recently became available under the Sebring Watershed Management Plan. The revenue<br />

agreement with Highlands County for $30,000 was cancelled since the project scope was reduced and the project cost<br />

was also reduced. The revised scope of work places more emphasis on completing the hydrologic model which is<br />

needed to complete the design and permitting of the MFL recovery project. The amendment for this project has been<br />

approved and the Phase II work order has been issued. The consultant completed the project development task of the<br />

work order and has selected sites for the groundwater elevation monitoring sites. The consultant is also currently making<br />

updates to the hydrologic model (AWSM). District staff met with the consultant in the field on June 25, 2009 to review<br />

sites where geotechnical data is needed.<br />