L2<strong>10</strong><br />

Implementation of BMPs - Phillippi Creek/Celery Fields<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

PRESTON, MATT<br />

Description<br />

This is a multi-year funded project to perform the Implementation of Best Management Practices (BMPs) element of<br />

the District's Watershed Management Program (WMP) for the Phillippi Creek Watershed. The watershed covers an<br />

area of approximately 56 square miles and is located in Sarasota County (County). This BMP will be implemented in<br />

the Celery Fields improvement area and specifically includes construction of additional storage to the existing south<br />

cell of the Celery Fields Regional Stormwater Facility. Implementation of the BMP includes the following tasks:<br />

construction and construction engineering and inspection. The proposed BMP will address level of service<br />

deficiencies. In addition, 120-acres of the southern cell pond of Celery Fields will be excavated to create a wetland<br />

habitat that will provide natural systems benefits.<br />

Benefits<br />

The project will provide additional storage within the watershed and, thereby, provide an improved level of service.<br />

These improvements will address structure flooding downstream along Phillippi Creek by providing flood protection for<br />

15 homes currently inundated and damaged during a <strong>10</strong>0-year flood event. Based on an Expected Damages Analysis,<br />

the expected flood damages to be mitigated by the project for a <strong>10</strong>0-year flood event is approximately $2.17 million.<br />

This project is also expected to improve water quality through increased residence times.<br />

Costs<br />

The current total budget for this project is $16.873 million. The FDEP is providing the County with a grant of<br />

$<strong>10</strong>,079,880 toward the project. The District's contribution is $2,903,060, which is being funded entirely by the<br />

Manasota Basin. The County will contribute $4,383,560. Implementation costs for the project are significantly greater<br />

than originally estimated in 2001. The District funding amounts shown in the table include staff salaries, travel and<br />

central garage.<br />

Additional Information<br />

A WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of Best Management Practices, and 5) Maintenance of Watershed Parameters<br />

and Models. Implementing elements of the WMP with local governments is one of the Comprehensive Watershed<br />

Management (CWM) initiative strategies. A WMP provides a method to evaluate the capacity of a watershed to<br />

protect, enhance, and restore water quality and natural systems, while achieving flood protection. This project involves<br />

the Implementation of BMPs which includes design, development of construction documents, construction permitting,<br />

land acquisition, bidding and contractor selection, construction of the BMPs and construction engineering and<br />

inspection. The original budget for the project was around $2.9 million and was based on a November 2001<br />

preliminary design report prepared by the County. The County is managing the project, and the District project<br />

manager must approve any agreements to accomplish project tasks.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 2,912,911 0 4,171 12,381<br />

0 2,929,463<br />

Project Funds Not Budgeted by the<br />

District<br />

Florida Department of Environmental<br />

Protection<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

<strong>10</strong>,079,880 0 0<br />

0<br />

0<br />

<strong>10</strong>,079,880<br />

Sarasota County 4,383,560 0 0<br />

0<br />

0 4,383,560<br />

0<strong>21</strong> - Manasota Basin 270<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$17,392,903