Bradenton - ASR Program<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 292,980 448,350 12,271 6,304<br />

0 759,905<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 <strong>10</strong>1,650 0<br />

0<br />

0<br />

<strong>10</strong>1,650<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 687,125 0 0<br />

0<br />

0 687,125<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,548,680<br />

Critical Project Milestones Projected Amended Actual<br />

1. Critical Project Milestones<br />

District Recognition/Signage: YES <strong>10</strong>/1/00 <strong>10</strong>/1/00<br />

2. First Contract for ASR well Construction and Cycles 1-6<br />

Preparation of Plans and Specs <strong>10</strong>/1/00 <strong>10</strong>/30/02 <strong>10</strong>/30/02<br />

Permitting 9/1/01 9/30/02 9/30/02<br />

Well Construction 1/1/02 11/20/03 11/20/03<br />

ASR Cycle Testing Through Cycle 6 2/1/02 12/20/04 <strong>10</strong>/1/05<br />

First Contract Amendment 2/25/02 5/3/02<br />

Final Report 3/28/02 7/20/05 <strong>10</strong>/1/05<br />

Project Complete 5/27/02 9/20/05 <strong>10</strong>/1/05<br />

Contract Termination <strong>10</strong>/1/02 <strong>10</strong>/1/05 <strong>10</strong>/1/05<br />

3. Second Contract (Pending) for Montioring Wells and Additional Cycle Tests<br />

Task 1 Cycle 6a Recovery and Design Equipment Upgrades 6/30/06 6/30/06<br />

Task 2 SZMW-3 Design, Permitting <strong>10</strong>/30/06 12/30/09<br />

Request Basin Board Transfer of Funds 12/30/06 12/30/06<br />

Contract Execution 1/30/07 1/24/07<br />

Task 3 SZMW-3 Construction <strong>10</strong>/30/07 12/30/09<br />

Task 4 Cycle Test 7 <strong>10</strong>/30/08 12/20/07<br />

Task 5 Feasibility Study Update <strong>10</strong>/30/08<br />

Task 6 SZMW-4 & SZMW-5 Design, Permitting, Construction 5/30/09<br />

Task 7 SZMW-4 and SZMW-5 Construction <strong>10</strong>/30/09<br />

Task 8 Cycle Tests 8 and 9 <strong>10</strong>/30/<strong>10</strong><br />

Task 9 Final Report, Application for Operations Permit <strong>10</strong>/30/11<br />

Second Contract<br />

Contract Completion Date 12/30/11<br />

Status As Of: September 14, 2009<br />

The scope of work for the first contract to construct and test an ASR well at the Downtown Booster Station site has been<br />

completed and all submittals have been received. Arsenic concentrations exceeding the drinking water standard (DWS)<br />

were observed in the monitoring well 200 feet away at the end of the cycle test 6. This new data indicates that the arsenic<br />

standard would be exceeded at the property line 75 feet away. In response to the arsenic mobilization issue at this site<br />

the City, FDEP, and District have been developing strategies to address the issue. Part of the strategy developed was to<br />

install additional monitoring wells and to continue cycle testing to demonstrate that the arsenic issue is limited in extent<br />

and not posing a threat to the aquifer. The strategy was, at the time consistent with guidance received from the FDEP<br />

indicating that as long as the arsenic concentrations were below the DWS at the property boundary, the site would be<br />

eligible for an operational permit. The City submitted a request for FY2007 funding through the District's Cooperative<br />

Funding Program to proceed with this additional work. Because of the urgent need to address the arsenic mobilization<br />

issue, the City made a request to the Manasota Basin Board at it's April 2006 meeting to transfer $550,000 in FY2006<br />

funds from the City's ASR project at the Evers Reservoir (L513) for use in this project. The request was approved by the<br />