10.12.2012 Views

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B063<br />

USGS Peace River Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

United States Geological Survey<br />

Project Manager KINSMAN, GRANVILLE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This initiative is to establish and maintain the Peace River Basin's surface water monitoring network, and is jointly<br />

funded by the Peace River Basin Board and the United States Geological Survey (USGS).<br />

Benefits<br />

This project provides basic surface water stage, discharge and/or water quality data collection to support assessing<br />

flooding events, developing surface water management plans, facilitating habitat restoration projects, establishment<br />

and monitoring of minimum flows and levels (MFLs), establishment of total maximum daily loads (TMDLs), land<br />

acquisition and management, and other critical water management activities.<br />

Costs<br />

In FY2009, surface water stage, discharge and/or water quality is measured at 39 sites in the Peace River Basin for a<br />

cost of $434,900. These sites are: Tiger Creek near Babson Park, Livingston Creek near Frostproof, Carter Creek<br />

near Sebring, Josephine Creek near DeSoto City, Peace Creek Drainage Canal near Wahneta, Saddle Creek at SH<br />

542 near Lakeland, Lake Parker Outlet near Lakeland, Saddle Creek at Structure P11 near Bartow, Peace River at<br />

Bartow, Peace River at Ft Meade, Whidden Creek near Ft. Meade, Bowlegs Creek near Ft. Meade, Payne Creek near<br />

Bowling Green, Thompson Branch near Wauchula, Peace River at Zolfo Springs, Charlie Creek near Gardner, Peace<br />

River at Arcadia, Hawthorne Creek at 760A near Nocatee, Joshua Creek at Nocatee, Horse Creek near Myakka<br />

Head, Horse Creek at SR 665 near Limestone, Horse Creek near Arcadia, Horse Creek near Nocatee, Prairie Creek<br />

near Fort Ogden, Shell Creek near Punta Gorda, Prairie Creek at Washington Loop Road, Shell Creek at Washington<br />

Loop Road, Peace Creek near Bartow, Peace River near Bartow, Six Mile Creek near Clear Springs, Barber Branch<br />

near Homeland, Peace River at Clear Springs, Peace River near Homeland, Phosphate Mine Outfall CS-8 near<br />

Bartow, and Charlie Creek near Crewsville. In FY2009, no changes were made to the data collection program in the<br />

Peace River Basin. The increase in FY2009 reflects an annual adjustment to pricing by the USGS. In FY20<strong>10</strong>,<br />

funding for this program will be transferred from the Peace River Basin Board to the Governing Board, and will be<br />

funded under the project code Z661.<br />

020 - Peace River Basin 77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!