L479<br />

Lk Hollingsworth Westside SW Treatment<br />

Third Amendment - Add FY2009 Funds <strong>10</strong>/<strong>10</strong>/08 11/4/08<br />

2. Critical Project Milestones<br />

Select Contractor 5/30/08 2/<strong>10</strong>/09 1/20/09<br />

Begin Construction 6/30/08 3/<strong>10</strong>/09 4/6/09<br />

Construction Complete 1/30/09 11/30/09<br />

Contract Close Out 3/30/09 1/31/<strong>10</strong><br />

Status As Of: August 26, 2009<br />

The project was originally designed to include wetland strands which would involve the purchase of privately owned lands<br />

along the lake's edge. Due to rising land costs the City has requested several no-cost time extensions until land<br />

acquisition was complete. Because of these rising land values, the City evaluated alternative designs to complete the<br />

project and reduce costs associated with land acquisition. The City has recently chosen an alternative design that<br />

involves the installation of underground hydrodynamic separators to treat stormwater rather than the originally planned<br />

wetland strands. The alternative design will allow the City to complete the project without acquiring privately owned lands,<br />

which should result in significantly reduced total project costs. The City has modified their existing permit and the Peace<br />

River Basin Board has included additional funding for this project in its FY2009 budget. The second amendment to the<br />

contract was executed on January 28, 2008 which extends the contract expiration date from December 31, 2008 to<br />

March 31, 2009. The third amendment has been executed and extends the contract period, revises the scope of work,<br />

and adds FY2009 funds to the existing contract. The bid for construction went out on December 15, 2008. The<br />

cooperator awarded the bid in January 2009. Project construction began on April 6, 2009 and is scheduled to be<br />

completed by November 2009.<br />