L854<br />

Bradenton/Manatee Co./Palmetto Reuse Interconnect Study<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is to perform a detailed study of the interconnection of the existing reclaimed water reuse systems of the<br />

City of Bradenton with the City of Palmetto and the City of Bradenton with Manatee County (MARS). The study will<br />

determine the amounts of reclaimed water from the City of Bradenton that can be beneficially reused during the next<br />

20 years by the City of Palmetto and Manatee County, and develop preliminary designs for the pumping, transmission<br />

and control facilities required to interconnect the three reuse systems. In addition to a final report, a 20-year agreement<br />

between the two cities and the city and county for implementing and operating the interconnected systems will be a<br />

project deliverable.<br />

Benefits<br />

This interconnection study will provide the City of Bradenton, Manatee County, the City of Palmetto, and the District<br />

with an implementable plan for interconnection of the three reuse systems.<br />

Costs<br />

The total project cost is estimated to be $120,000 and the District's share is $40,000 in FY2008. The City of Bradenton<br />

will fund $80,000 and plans to receive $20,000 from Manatee County and $20,000 from the City of Palmetto. Any<br />

additional funds are for staff time.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 47,2<strong>21</strong> 0 3,661 779<br />

0 51,661<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 40,000 0 0<br />

0<br />

0 40,000<br />

City of Palmetto 20,000 0 0<br />

0<br />

0 20,000<br />

Manatee County 20,000 0 0<br />

0<br />

0 20,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$131,661<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Executed: 1/31/08 2/25/08<br />

Begin Interconnect Study: 3/31/08 3/31/08<br />

Complete Interconnect Study: 5/29/09 5/30/09<br />

Status As Of: August 25, 2009<br />

The agreement was executed on February 25, 2008. The consultant, Jones, Edmunds & Associates, Inc. was given a<br />

notice to proceed on March 31, 2008. A project kick-off meeting was held May 19, 2008. Draft interlocal agreements<br />

between the City of Bradenton and City of Palmetto and between the City of Bradenton and Manatee County have been<br />

prepared and reviewed by the City attorney. Data show that the City of Palmetto will have adequate reclaimed water from<br />

it's own reuse system to meet there needs for the next twenty years. An agreement between the City of Bradenton and<br />

Manatee County for the City to provide MARS the desired quantities of reclaimed water appears unlikely. The study of<br />

the interconnect between Bradenton and Palmetto was completed May 25, 2009. The study of the interconnect between<br />