L623<br />

Venice Imp. BMPs Hatchett Creek Eastgate (Withdrawn)<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Venice<br />

Project Manager PRATER, CORRINA<br />

Task Manager(s)<br />

NORTON, NANCY<br />

Status Withdrawn<br />

Description<br />

This project is to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for the Hatchett Creek Watershed in Sarasota County. This BMP will be<br />

implemented in the Eastgate improvement area. The project will improve flood protection level of service deficiencies<br />

by enlarging outfall pipes and providing additional storage within the watershed by increasing the size of the retention<br />

area. The proposed project will include an open swale ditch system or a stormwater retention pond to improve water<br />

quality by increasing residence time of stormwater runoff prior to discharge. With FY2007 funding, the work on the<br />

Implementation of BMPs will begin and includes the following tasks: hydraulic evaluation, design, development of<br />

construction documents, construction permitting, bidding and contractor selection, and construction of the BMPs.<br />

FY2008 funding will be used for the following tasks: evaluation, development of construction documents, construction<br />

permitting and construction of the BMPs.<br />

Benefits<br />

The project will improve level of service deficiencies by improving conveyance and providing additional storage within<br />

the watershed. The project is also expected to improve water quality by increasing residence times in the new storage<br />

area.<br />

Costs<br />

The total budgeted amount for this project is $305,000, of which the District's share is $92,500. The District's share is<br />

being funded entirely by the Manasota Basin Board. The City will contribute $<strong>21</strong>2,500. The City has previously<br />

expended approximately $120,000 for temporary flood mitigation activities within the project area, such as regrading<br />

drainage swales. For FY2007, $55,000 is appropriated in the Basin's budget. For FY2008, $37,500 is appropriated<br />

from the Manasota Basin to continue the project. When each task is completed the project budget may require<br />

refinement based on the information gathered. The probable construction costs for this project are based on the BMP<br />

alternative analysis developed by Sarasota County in the Hatchett Creek Master Plan. The District funding amounts<br />

shown in the table include staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. Implementation of BMPs includes the following tasks: design, development of construction<br />

documents, construction permitting, land acquisition, bidding and contractor selection, construction of the BMPs and<br />

construction engineering and inspection. The City previously budgeted funds for the improvement area for performing<br />

temporary mitigation by regrading drainage swales. A cooperative funding expenditure agreement with the City will be<br />

developed to complete the Implementation of BMPs. The City will manage the project, where the District project<br />

manager must approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 98,564 0 4,780<br />

0<br />

0 <strong>10</strong>3,344<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Venice <strong>21</strong>2,500 0 0<br />

0<br />

0 <strong>21</strong>2,500<br />

0<strong>21</strong> - Manasota Basin 306<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$315,844