B238<br />

Crop Coefficients and Water Use for Peppers in Southwest Florida<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

University of Florida<br />

Project Manager COHEN, RON<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

Peppers are one of the major row crops grown in the District and in some regions, second only to tomatoes. The<br />

actual amount of water these crops use is based on soils, growing season and climatic conditions. To improve the<br />

crops' water use efficiency and to help conserve water, it is important for the grower and the District to know exactly<br />

how much water the crops require. This lysimeter study will determine how much water pepper plants in Southwest<br />

Florida need, determine crop coefficients and an irrigation schedule to help growers.<br />

Benefits<br />

Currently there are over 8,000 acres directly permitted for pepper production and an additional 17,000 acres that might<br />

be in a rotation with pepper. These sites are permitted for about 16.5 Mgd (27 Mgd for rotational sites). The number of<br />

acres planted and their water use will change annually based on market and climatic conditions. Assuming that results<br />

from this project will help reduce <strong>10</strong>% of that water, the savings could be about 1.7 Mgd. Added benefits to this project<br />

include a potential reduction in pollutant loading and information for AGMOD.<br />

Costs<br />

This two-year project will cost $135,000. These costs will be divided between the five basin boards that have the most<br />

acres permitted for pepper production. Project costs have been prorated between the Alafia (49%), Hillsborough River<br />

(19%), Manasota (15%), Peace River (8%) and the Withlacoochee River (9%) Basin Boards. Basin Board funds will<br />

be budgeted in FY2007, FY2008 and FY2009. Alafia River will budget $<strong>21</strong>,891, Hillsborough River will budget $8,514,<br />

Manasota will budget $4,257, Peace River will budget $3,649 and the Withlacoochee River will budget $6,689 each<br />

year.<br />

Additional Information<br />

Currently, the District and the growers use water use values developed outside of Florida. Although these values<br />

seem to be reasonable, local crop coefficients could help enhance irrigation scheduling and reduce water use. In<br />

addition, the crop coefficients will help decrease the transport of nutrients into the ground and surface water. Water<br />

use within the District is expected to increase by 2020. It is anticipated that a large portion of this increased demand<br />

will be met by water conservation. Since agricultural water use accounts for the largest fraction of the total permitted<br />

water amount in the District, efforts are needed to develop methods to help this water use sector reduce their water<br />

use.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 43,782 0 <strong>21</strong>,891<br />

0<br />

0 65,673<br />

013 Hillsborough River Basin 17,028 0 8,514<br />

0<br />

0 25,542<br />

019 Withlacoochee River Basin 13,378 0 6,689<br />

0<br />

0 20,067<br />

020 Peace River Basin 7,298 0 3,649<br />

0<br />

0 <strong>10</strong>,947<br />

0<strong>21</strong> Manasota Basin 8,514 0 4,257<br />

0<br />

0 12,771<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$135,000<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement to Contracts 8/1/06 5/1/07<br />

0<strong>21</strong> - Manasota Basin 145