P727<br />

City of Lake Wales Reuse Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Lake Wales<br />

Project Manager NOURANI, MEHRSHAD<br />

Task Manager(s)<br />

Status Ongoing<br />

NOURANI, MEHRSHAD<br />

Description<br />

This project consists of a reclaimed water system to be completed in three phases: Phase I, which has completed,<br />

included the construction of a 2 mgd capacity pumping station at the existing Lake Wales wastewater treatment plant<br />

(WWTP) and 14,000 linear feet of 20-inch diameter transmission main from the WWTP to a cluster of 7 rapid<br />

infiltration basins (RIBS) on City-owned property southwest of the WWTP. Phase II is also complete. It included the<br />

design and construction of a high service pumping station and a 2-mg reclaimed water storage tank at the RIB site.<br />

Phase III includes design and construction of approximately 20,970 linear feet of transmission line from the RIB site<br />

to Mayfair residential/commercial development, City-owned soccer fields, City-owned groves, Whispering Ridge<br />

residential development, and Long Leaf Business Park. Phase III design was completed in January 31, 2008. Phase III<br />

transmission line construction is currently underway. The project is scheduled for completion by July 2009.<br />

Benefits<br />

This project provides 2.025 mgd of reclaimed water, offset approximately 1.245 mgd of ground water from the Floridan<br />

Aquifer.<br />

Costs<br />

The total project cost is $5,626,387 and the District's share is $2,092,000. The City is completing this project with<br />

District Cooperative Funding Program dollars and DEP State Revolving Fund (loan) dollars. The Peace River Basin<br />

Board budgeted $699,500 in FY2002, and the remaining portion of the District's share in the future. Budget below<br />

does not reflect prior year funding for $562,500 in FY1997, $130,000 in FY1998 and $700,000 in FY1999. Total<br />

amount encumbered to date is $2,092,000. Total amount expended to date is $1,011,855 and $1,073,917 will remain<br />

to complete this project by December 2009.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 707,137 0 4,368 2,958<br />

0 714,463<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lake Wales 0 0 0 1,080,145<br />

0 1,080,145<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,794,608<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 1/31/97 1/31/98 1/2/99<br />

Phase I Commence Construction <strong>10</strong>/31/97 <strong>10</strong>/31/00<br />

Phase I Completion 6/30/98 5/31/98<br />

Phase II Design Commence 4/25/99 1/30/98<br />

Phase II Complete Design 2/28/01 2/3/03 1/6/05<br />

Phase III (delayed by the City) Desing Commence 3/1/02 9/30/05 5/30/07<br />

Phase III (delayed by the City) Design Complete 12/29/02 3/31/06 1/31/08<br />

Phase III Construciton Commence 1/31/08 12/31/07 1/31/08<br />

Phase III Construction Complete 7/31/09<br />

020 - Peace River Basin 358