B063<br />

USGS Peace River Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Status As Of: August <strong>21</strong>, 2009<br />

FY2009 data collection is ongoing, with no problems to report. The District's FY2009 commitment to the project is<br />

$434,900, of which $<strong>21</strong>7,450 has been expended (the USGS bills us every six months for these activities).<br />

Accelerated Action-To-Date: On-time<br />

020 - Peace River Basin 79