L915<br />

City of Lakeland Pre-Rinse Spray Valve Retrofit Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

City of Lakeland<br />

Project Manager WHITE, BRENT<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The City of Lakeland is conducting a pre-rinse spray valve replacement and conservation education program for the<br />

City's food service industry. The program will focus on replacing high water use spray valves utilized to clean food<br />

from dishes, utensils, and pots and pans. The FY2008 project targets water customers in the food service industry to<br />

replace spray valves in 300 locations at no cost to the water customer. Conventional pre-rinse spray valves utilize<br />

from 2.65 to 4.0 gallons per minute and can be responsible for up to fifty percent of food service industry total dish<br />

washing water use. Water efficient pre-rinse spray nozzles use approximately 1.6 gallons per minute. The "Potable<br />

Water Conservation Best Management Practices for the Tampa Bay Region Report" (Tampa Bay Water, 2003)<br />

identifies the use of water-efficient pre-rinse spray valves as a best management practice in Industrial, Commercial<br />

and Institutional facilities (ICI).<br />

Benefits<br />

The total estimated water savings is 60,000 gallons of potable water per day or <strong>21</strong>.9 million gallons per year.<br />

Costs<br />

The total project cost is $45,000. The breakdown of District funding is: Peace River Basin Board - $15,750,<br />

Hillsborough River Basin Board - $4,500 and the Alafia River Basin Board - $2,250. The City of Lakeland's share is 50<br />

percent, or $22,500. The cost benefit for this project, using the total cost amortized over 5 years at 8% interest, is<br />

$0.50 per <strong>10</strong>00 gallons of water.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 2,756 0 557 635<br />

0 3,948<br />

013 Hillsborough River Basin 5,006 0 557 660<br />

0 6,223<br />

020 Peace River Basin 16,761 0 1,114 635<br />

0 18,5<strong>10</strong><br />

Project Funds Not Budgeted by the<br />

District<br />

City of Lakeland 22,500 0 0<br />

0<br />

0 22,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$51,181<br />

Critical Project Milestones Projected Amended Actual<br />

Develop RFP <strong>10</strong>/1/07 <strong>10</strong>/3/07<br />

Evaluate RFP's and Select Contractor 11/1/07 12/31/07<br />

Choose Consultant 12/1/07 2/5/08<br />

Transfer All Necessary Data to Contractor 12/31/07 2/20/08<br />

Program Implemented 1/1/08 5/1/08<br />

Develop Survey Instrument 4/1/08 5/15/08<br />

Installation Completion of 300 units 9/1/08 12/31/08 12/31/08<br />

Mail All Surveys 11/1/08 12/31/08<br />

Begin Program Evaluation 1/1/09 1/1/09<br />

020 - Peace River Basin 3<strong>10</strong>