W509<br />

Alligator Creek In-Stream Restoration<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

PECK, MICHAEL<br />

Description<br />

Sarasota County is developing the Lemon Bay North Watershed Management Plan (L6<strong>10</strong>) to protect and improve<br />

water quality and restore natural systems throughout the watershed. The Lemon Bay Plan has identified several<br />

in-stream restoration projects along Alligator Creek and nearby areas to address unstable conveyance systems that<br />

are currently degrading water quality and impacting natural systems. The goal of this project is to achieve improved<br />

water quality and increase natural habitat along Alligator Creek through the combined use of the following methods<br />

at several project locations: (1) Stream bank re-sloping and restoration through removal of exotic vegetation and<br />

replanting appropriate native wetland species of vegetation; (2) Incorporating the low impact design technique of<br />

bioswales along the top of stream banks to reduce the velocity of overland flow of stormwater and protect natural<br />

systems; (3) Installation of weirs in select locations to provide increased residence time for wetland treatment<br />

processes. The County will begin design of the two project locations in FY2009 and anticipates starting construction in<br />

FY20<strong>10</strong>.<br />

Benefits<br />

This project will improve surface water quality by reducing sedimentation and erosion by re-sloping the banks and<br />

planting appropriate native vegetation. The installation of weirs at several locations will increase residence time and<br />

thereby provide additional in-stream water quality treatment.<br />

Costs<br />

Current estimated project construction costs are estimated at $1,000,000 but will be further refined during project<br />

design. For FY2009 Sarasota County has dedicated $200,000 to fund preliminary design and permitting. For FY20<strong>10</strong>,<br />

Sarasota County is contributing $400,000 towards project construction and has requested the District contribute<br />

$600,000 through the Cooperative Funding Initiative. For FY20<strong>10</strong> the District budgeted $150,000 for the project. The<br />

District's FY20<strong>10</strong> share is split between the Manasota Basin Board ($75,000) and State SWIM ($75,000). District<br />

funds shown in the table include staff salaries, travel and central garage. If approved for future funding, the District's<br />

total contribution would be spread over several fiscal years.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 78,714 450,000 528,714<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 78,713<br />

0 78,713<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 0 200,000 400,000<br />

0 600,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,207,427<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Develop Draft Agreement with Sarasota County <strong>10</strong>/30/09<br />

0<strong>21</strong> - Manasota Basin 61