L613<br />

Sarasota Imp. BMPs South Pelican Drive<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager SMITH, RANDY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for the Hudson Bayou Watershed in Sarasota County. This project will be<br />

implemented in the South Pelican Drive improvement area which has experienced chronic flooding over the past few<br />

years, especially during hurricane Jeanne in 2004. The project will eliminate structural flooding and improve residential<br />

roadway access by providing additional storage and improving conveyance. This will be accomplished through<br />

construction of an attenuation storage pond downstream of the flooded structures and upsizing conveyance pipes and<br />

channels between the flooded areas. The project is also expected to improve water quality by increasing residence<br />

time in the new storage area. This project includes construction of the BMP's and associated construction engineering<br />

and inspection.<br />

Benefits<br />

The project is expected to meet level of service criteria during a 25-year storm event, eliminate structural flooding of<br />

four structures and improve residential roadway access by providing additional storage and improving conveyance.<br />

The project is also expected to improve water quality by increasing residence times in the new storage area. The flood<br />

hazard mitigation benefit/cost ratio calculated by the County is 1.03.<br />

Costs<br />

The original FY2007 estimated project cost for construction was $594,000 and the District's share of $200,000 was<br />

funded by the Manasota Basin Board. The County was unable to secure the land necessary for the project, which has<br />

forced design changes and increased costs. The new estimated project cost for construction is $1,577,940. The<br />

District funding amounts shown in the table below include staff salaries, travel and central garage charges.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. The County previously budgeted funds for the project design, development of construction<br />

documents, construction permitting, land acquisition, and bidding and contractor selection. The probable construction<br />

costs for this project were based on the BMP alternative analysis developed by the County in its Hudson Bayou Master<br />

Plan completed in September 1994 and updated in April 1997. The County and the City of Sarasota will be required to<br />

acquire a joint drainage easement to implement the BMP. A cooperative funding expenditure agreement with the<br />

County was developed to complete the Implementation of BMPs. The County will manage the project, where the<br />

District project manager must approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 206,711 0 3,311 3,493<br />

0 <strong>21</strong>3,515<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 1,534,791 0 1,136<br />

0<br />

0 1,535,927<br />

0<strong>21</strong> - Manasota Basin 296<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,749,442