B<strong>21</strong>7<br />

Ridge Lakes Stormwater Improvement<br />

providing an easement to the Town of Avon Park. District staff will assist the Town with the easement agreement. In<br />

addition, the District will begin design and permitting of the projects on Lakes Isis and Tulane. An agreement has been<br />

prepared with the District's consultant to begin survey work for these next projects. ACTION-TO-DATE: Complete.<br />

Bidding and procurement of a construction contractor was completed on time. Construction of the project on Lake<br />

Menzie was also completed on time.<br />

020 - Peace River Basin 99