H063<br />

PR/MRWSA Regional Resource Development Feasibility Study<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 520,157 125,000 6,708<br />

0<br />

0 651,865<br />

020 Peace River Basin 144,760 33,750 1,118<br />

0<br />

0 179,628<br />

0<strong>21</strong> Manasota Basin 372,141 91,250 2,236<br />

0<br />

0 465,627<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Central W<br />

Coast SW Enhanc<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

50,000 0 0<br />

0<br />

0<br />

50,000<br />

Project Funds Not Budgeted by the<br />

District<br />

PR/MRWSA 1,225,000 0 0<br />

0<br />

0 1,225,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,572,120<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Approved 8/17/07 9/18/07<br />

Work Order #1-deliverable #1 11/7/07 12/31/07<br />

Work Order #1-deliverable #2 12/7/07 12/31/07<br />

Execute Work Order #2 1/<strong>10</strong>/08 1/<strong>10</strong>/08<br />

Execute Work Order #3 5/7/08 5/7/08<br />

Draft Final Report deliverable 8/29/08 <strong>10</strong>/13/08 11/11/08<br />

Final Report 12/30/08 3/29/09 9/3/09<br />

Status As Of: September 03, 2009<br />

Status History: The Authority received three submittals on April 25 for consultant services to conduct water supply<br />

feasibility studies of the Shell Creek, Cow Pen Slough/Dona Bay, and Upper Myakka River Systems and authorized<br />

contract negotiations with the top ranked firm, the PBS&J team. In addition, District staff brought an out of cycle funding<br />

request for $250,000 to the June Peace River Basin Board and Governing Board that was approved, contingent on<br />

approval by the Manasota Basin Board in July. The remaining $1,000,000 was funded in the FY2008 budget. Several<br />

scoping meetings took place with the consultant and contracts are executed. Scope and Work Order #1 of the Authority's<br />

Consultant Contract was approved by their Board. Existing data collection and evaluation and field reconnaissance visits<br />

to all three proposed areas by the consultant, the Authority, and District staff are complete. A Coordination meeting was<br />

held between District Ecologic Evaluation staff and Source Feasibility Study team. The first deliverable from Work Order<br />

#1 was a techinical report summarizing inventoried data and relevant technical reports and/or models and a database of<br />

the inventoried data. The second deliverable from Work Order #1 was a document describing preliminary alternatives<br />

recommended for efforts conducted in subsequent phases of the feasibility studies. Additional water quality testing for<br />

parameters such as corrosiveness, Giardia, Cryptosporidium, TOC (Total Organic Carbon), took place to allow for a<br />

balanced comparison between the proposed sites. Two joint meetings were held with the MRWI team to discuss<br />

hydrologic alternative scenarios in the Upper Myakka. The final Work Order for the project was executed covering<br />

preliminary water treatment processes, intake structure identification, transmission mains location, the Source Water<br />

Feasibility Study Report, Reliability Model update, and Public <strong>Meeting</strong>s. Five Authority Technical Advisory Committee<br />

(TAC) meetings were held on June 30, July 22, August 15, September 22, and October 24, 2008 to provide project<br />

updates. Proposed conjunctive use was a major topic at those meetings. The results of the Feasibility Study was<br />

presented at Authority Board workshop on November 5, 2008. Comments on the Draft Source Feasibility Report were<br />

discussed at the TAC meeting on December 12, 2008. The Consultant is complete with the final report. The cooperative<br />

funding agreement with the Authority expired March 30, 2009. The Authority assured the District, the work will be<br />

complete, but the decision-making process on which projects will move forward into the next phase of design will<br />

continue until late spring 2009. Authority Staff has recommended the next source of water be from brackish groundwater<br />

and re-permitting the Peace River facility to utilize the allowable revised flow quantity from the middle Peace River MFL.<br />

Based on current demand projections, the Authority anticipates no new supply needed from 20<strong>10</strong>-2013, 3 mgd from<br />

2014-2019, 5 mgd from 2020-2023, and 8 mgd from 2024-2029. Current Status: The Final Source Feasibility Report was<br />