K459<br />

Charlotte County School Board - Imp. BMPs Punta Gorda Campus<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County School Board<br />

Project Manager FRIES, GEORGE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is a project to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for a portion of the Upper Alligator Creek Watershed (North Fork) located in<br />

Punta Gorda. Implementation of BMPs includes the following tasks: design, development of construction documents,<br />

construction permitting, land acquisition, bidding and contractor selection, construction of the BMPs and construction<br />

engineering and inspection. The study area is 280 acres, bounded by Carmalita Street to the north, Education Avenue<br />

to the east, Cooper Street to the west and Taylor Road to the south. The land use is partly residential which was built<br />

in the 1960's but it includes four Charlotte County School Board campuses and facilities: Sallie Jones Elementary<br />

School, Charlotte High School, Punta Gorda Middle School and the Central Operations Center built in 1956, 1926,<br />

1971 and 1966, respectively. The proposed project consists either of (1) improving +/- 8,600 lf. of an intermediate<br />

conveyance way along Education Ave., Henry St. and Cooper St. that includes replacing the inadequate roadway<br />

culvert crossings, or (2) collecting the surface water runoff within the complex through a surface water management<br />

area on the corner of Henry St. and Education St., and diverting it by gravity to Airport St. through a pipe system along<br />

Education St., or (3) combination of both, depending on regulatory constraints.<br />

Benefits<br />

The project will improve level of service deficiencies by improving conveyance and providing additional storage within<br />

the watershed. The project is also expected to improve water quality by increasing residence times in the storage area.<br />

Costs<br />

Funding for this project was provided in the Peace River Basin Board budget for FY2001 ($280,000). The School<br />

Board is also contributing $280,000 to the cost of the project. The District funding amounts shown in the table includes<br />

staff salaries.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies and one of the District's Strategic Priorities. The WMP provides a method to evaluate the<br />

capacity of a watershed to protect, enhance, and restore water quality and natural systems while achieving flood<br />

protection. Finish floor elevations are substandard, with shallow and non-uniformly graded road right-of-way<br />

conveyances, and mismatched culvert sizes and inverts. A mean annual summer rainfall event will flood these<br />

campuses and the adjoining residential areas. The existing collection, storage and conveyance elements will be<br />

improved to provide flood protection, and water quality treatment. The improvements will balance on site storage and<br />

off site conveyance where downstream property owners will not be adversely impacted. A cooperative funding<br />

expenditure agreement with the Charlotte County School Board has been developed to complete the Implementation<br />

of this BMP. The School Board is managing the project, where the District project manager must approve any<br />

agreements to accomplish project tasks.<br />

020 - Peace River Basin 242