W627<br />

Bradenton Beach Stormwater Retrofits<br />

Project Type SWIM<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Bradenton Beach<br />

Project Manager NORTON, NANCY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to the FY20<strong>10</strong> Cooperative Funding request by the City of Bradenton Beach to design,<br />

permit and construct stormwater retrofit Best Management Practices within five sub basins that discharge to Sarasota<br />

Bay. The sub basins are delineated as; Avenue A between 24th Street and 25th Street comprising 17.5 acres, Gulf<br />

Drive Basin at Runaway Bay and Avenue B comprising 24.2 acres, Bay Drive South from 3rd Street South to 5th<br />

Street South draining 11.09 acres, First Street North to Bridge Street comprising 11.11 acres and Bay Drive North<br />

between 12th Street North and <strong>10</strong>th Street North comprising 6.5 acres. The objectives of the project include improving<br />

water quality, providing shoreline stabilization, enhancing shoreline functions, and reducing flooding. Best<br />

Management Practices will be implemented to stabilize the shoreline and protect existing mangroves. Project limits<br />

include reconstruction of the city owned land for the construction of shallow grassed swales with outfall pipes. The<br />

swales will provide treatment of stormwater through percolation and evaporation. The baffle structures will be installed<br />

at outfall locations to provide additional treatment. The shoreline will be repaired and restored to enhance the quality<br />

and function of the existing wetlands habitat. The City of Bradenton Beach will be responsible for ongoing maintenance<br />

and will perform monitoring at each outfall location to establish the treatment effectiveness.<br />

Benefits<br />

The project is anticipated to reduce total suspended solids (TSS) by approximately 15,000 pounds per year (80%<br />

reduction) with implementation of the BMP's proposed in this project.<br />

Costs<br />

The total estimated project cost is $3,120,650. The FY20<strong>10</strong> total project cost is $200,000, with the City of Bradenton<br />

Beach and the District each contributing half ($<strong>10</strong>0,000). The District's share is split between the Manasota Basin<br />

Board ($50,000) and State SWIM ($50,000). Additional funds for design and construction will be budgeted in future<br />

fiscal years. District funds shown in the table include staff salaries.<br />

Additional Information<br />

Since 1950, approximately 40 percent of Sarasota Bay's intertidal wetland habitat has been lost due to development<br />

and reduction in water quality. This resulted in a decline in the aesthetic, recreational, and commercial value of the<br />

bay, as well as a loss of habitat for native plants and animals. The SWIM Plan for Sarasota Bay outlines goals to<br />

restore habitat throughout the bay area and reduce pollutant loads entering the bay. The objectives of this project are<br />

consistent with these goals.<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 52,449 1,375,575 1,428,024<br />

District Budgeted - Outside Revenue<br />

WMLTF (SWIM) - Prior Year Funds 0 0 52,448<br />

0 52,448<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton Beach 25,000 144,500 <strong>10</strong>0,000 1,375,575 1,645,075<br />

0<strong>21</strong> - Manasota Basin 117<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,125,547