K269<br />

Sarasota Co. - N. Sarasota Co. Reclaimed Water ASRs<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1,750,092 286,743 3,661 3,820 1,097,383 3,141,699<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

164,864 24,864 0<br />

0<br />

0<br />

189,728<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 1,725,000 0 0<br />

0 1,414,341 3,139,341<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$6,470,768<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Executed: 5/<strong>10</strong>/00 5/<strong>10</strong>/00<br />

Start Permitting and Design: 5/<strong>10</strong>/00 5/<strong>10</strong>/00<br />

Complete Permitting and Design Well #1: 8/1/01 9/17/04<br />

District Recognition/Signage: YES 5/1/02 5/1/02<br />

Start Well # 1 Construction: 5/1/02 9/6/05<br />

Complete Construction Well #1: 12/30/02 4/30/06 4/30/06<br />

Engineering Report Well #1: 7/31/03 7/31/06 7/31/06<br />

Start wellhead & UV construction: 9/30/03 1/31/<strong>10</strong><br />

Complete wellhead & UV construction: 12/16/03 9/30/<strong>10</strong><br />

Begin Cycle tesing Well # 1: 6/30/04 11/30/<strong>10</strong><br />

Start Well # 2 & # 3 Construction: 6/30/04 1/31/11<br />

Complete Construction Well #2 & #3: 12/31/04 6/30/11<br />

Final Invoice: 6/30/05 9/30/12<br />

Project Completion: 12/31/05 12/31/12<br />

Status As Of: August 25, 2009<br />

The first reclaimed water ASR well system has been designed, permitted, and is under construction. The consultant,<br />

PBS&J, is overseeing the construction. Diversified Well Drilling started on the Storage Zone Monitor Well (SZMW) on<br />

September 6, 2005. The SZMW was completed February 28, 2006. The driller has completed the Lower Zone Monitor<br />

Well (LZMW) and the Upper Zone Monitor Well (UZMW). A larger drill rig was mobilized and started drilling the ASR test<br />

well February 2006. Construction of the ASR test was substantially complete by May 31, 2006. PBS&J has prepared a<br />

final engineering report for construction and construction testing of the ASR. Design of the Central County Wastewater<br />

Treatment Facility expansion, and the pumps, piping and UV treatment system for the ASR, is complete. The County<br />

requested to add UV disinfection equipment and additional funding for this project in a FY2006 cooperative funding<br />

initiative proposal. This was approved by the Basin Board and an amendment was executed on October 9, 2006 to<br />

include the changes in scope and funding. The County and the District have agreed to put this project on hold pending a<br />

resolution to the arsenic issue. The District is involved in studies to look for ways to meet the EPA and DEP water quality<br />

requirements for arsenic. Results from these studies have been delayed due to the drought and are now scheduled to be<br />

available in January 20<strong>10</strong>. To date, the Manasota Basin Board has encumbered $<strong>10</strong>0,000 in FY2000, $550,000 in<br />

FY2001, $390,000 in FY2002, $405,000 in FY2003, $286,743 in FY2006 and $280,000 in FY2007. Water Protection and<br />

Sustainability Trust Fund (WPSTF) provided $164,864 for this project in FY2006/7. The remaining $1,127,598 will be<br />

requested in future fiscal years. The County has spent $972,900 in design and construction costs for this project. To<br />

date, the District has reimbursed the County $449,135 from the Manasota Basin and $74,631 from WPSTF funds.<br />

0<strong>21</strong> - Manasota Basin 251