W617<br />

Sarasota Imp. BMPs Coastal Basin Beach Road<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 245,916 123,961 124,259<br />

0 494,136<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 245,915 123,960<br />

0<br />

0 369,875<br />

State Trust Funds (SWIM) - Prior 2006 0 0<br />

0<br />

0 1<strong>21</strong>,875<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,383<br />

0 2,383<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 764,500 243,750 243,750<br />

0 1,252,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,240,269<br />

Critical Project Milestones Projected Amended Actual<br />

1. Implementation of BMPs for Coastal Basin Beach Road<br />

Draft Contract and Scope of Work 9/30/07 7/25/07<br />

Contract Executed by the County 11/30/07 12/18/07 12/18/07<br />

Application for FY2009 Funding 12/<strong>10</strong>/07 12/7/07<br />

Contract Executed by the District 12/31/07 3/6/08<br />

Notice to Proceed 1/15/08 3/12/08<br />

Commence Design and Permitting 3/30/08 3/30/08<br />

Complete Design and Permitting 3/30/09 12/1/08<br />

Commence Construction 4/30/<strong>10</strong><br />

Complete Construction 4/30/11<br />

Final Report and As-Builts 12/31/11<br />

Final Report and As-Builts 12/31/11<br />

Contract Termination 3/31/12<br />

Status As Of: June 30, 2009<br />

The contract was fully executed on 03/06/2008 and originals returned to the County with a Notice to Proceed on<br />

3/11/2008. The original design has been completed and the ERP has been issued, however, there is significant<br />

opposition to the proposed project among citizens living near the proposed stormwater system outfall on Grande Canal.<br />

The County has been and is seeking to address this through both public education and investigation into alternate outfall<br />

locations. The consultant is currently preparing calculations to compare existing nutrient loadings at the proposed outfall<br />

with post-developed nutrient loadings. An alternative design plan with a Gulf outfall location is also being prepared in<br />

order to compare construction costs.<br />

0<strong>21</strong> - Manasota Basin 98