N113<br />

Charlotte County Toilet Rebate Project - Phase II<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Charlotte County Utilities<br />

Project Manager WHITE, BRENT<br />

Task Manager(s)<br />

WHITE, BRENT<br />

Status Ongoing<br />

Description<br />

This project consists of the replacement of existing plumbing fixtures (Toilets, showerheads and aerators) with water<br />

saving fixtures. The project will replace high-volume toilets (pre-1994) with ultra-low volume (ULV's) or high-efficiency<br />

toilets (HET's) by offering 775 rebates of $<strong>10</strong>0 per year to residential customers of Charlotte County Utilities. ULV's<br />

have a flush rate of 1.6 gallons per flush (gpf) and HET's have a flush rate of 1.28 gpf. Single and multi-family<br />

customers will be able to replace up to two toilets per dwelling. The project will also replace up to 775 showerheads<br />

and aerators with low-flow equivalents. This project will focus on education HET and ULV users on the proper<br />

maintenance necessary to ensure that each toilet remains a water-conserving fixture over a 20-year life expectancy by<br />

focusing on leak detection and proper flapper management.<br />

Benefits<br />

It is estimated that the replaced toilets, once all 775 are rebated, would save approximately 16,839 gallons per day.<br />

The showerheads are expected to save an estimated 4,600 gallons per day and the aerators were anticipated to save<br />

7,031 gallons per day. The total project savings was projected to be 28,470 gallons per day, or <strong>10</strong>,391,696 gallons per<br />

year.<br />

Costs<br />

The total project cost is $114,020, with the Peace River Basin Board and Charlotte County Utilities each funding a 50<br />

percent share, or $57,0<strong>10</strong>. The cost amortized at 8 percent over 20 years, was $1.18 per thousand gallons saved<br />

(calculated using a weighted average based on the total benefit for the life of the project).<br />

Additional Information<br />

This is a continuation of the FY2008 Project, which offerred 385 rebates of up to $<strong>10</strong>0 per toilet for multi-family,<br />

commercial and single-family customers. A contractor is administering the program. One year of account-level<br />

metered water-use data prior to and one year of metered water use after the retrofit installation will be collected as the<br />

raw data for the final savings analysis. Charlotte County Utilities will provide actual billing data and ensure <strong>10</strong>0 percent<br />

fixture inspection through the contractor who is doing the collection. This project will also institute an educational<br />

program designed to assist customers in long-term maintenance related to water savings, such as selecting parts for<br />

repairs, leak detection and choosing proper replacement flapper models for their HET or ULV toilets. ULV Toilets have<br />

a flush rate of 1.6 gpf and HET's have a flush rate of 1.28 gpf. This effort will ensure the retrofit fixture will remain a<br />

water-conserving fixture throughout its life-expectancy. Bi-monthly status reports will be provided to the District to<br />

update project accomplishments.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 59,451<br />

0 59,451<br />

Project Funds Not Budgeted by the<br />

District<br />

Charlotte County Utilities 0 0 0 57,0<strong>10</strong><br />

0 57,0<strong>10</strong><br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$116,461<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 338