10.12.2012 Views

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B620<br />

Mapping and GIS<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers,<br />

Pinellas-Anclote River, Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

N/A<br />

Project Manager DICKS, STEVE<br />

Task Manager(s)<br />

DICKS, STEVE<br />

Status Ongoing<br />

Description<br />

This is a continuing initiative with the goal of providing Geographic Information System (GIS), aerial photo<br />

interpretation and photogrammetric mapping services to support Governing and Basin Board activities. GIS support<br />

includes the input, management, analysis and distribution of spatial data, the design and implementation of databases,<br />

software training and map production. Aerial photo interpretation includes land use and cover mapping in support of<br />

land acquisition, Surface Water Improvement and Management (SWIM), engineering, planning and environmental<br />

studies. Photogrammetric support includes the mapping of topographic information, collection of aerial photographs<br />

and satellite imagery and the production of digital orthophotographs. This program also supports the distribution of<br />

data to the public and routine maintenance activities. The annual budget includes administrative costs for salaries,<br />

travel, training, plotting and photographic supplies, maps and other data purchases, etc.<br />

Benefits<br />

Mapping and GIS has been a continuing activity since 1987 and is required to support the District's GIS, digital<br />

orthophoto, aerial mapping and other data collection, maintenance and management activities. The District's GIS<br />

database is an integral component of planning, engineering, regulatory, and land acquisition and management<br />

activities. In a rapidly growing area such as the District, continued maintenance and expansion is needed for the GIS<br />

database to meet new demands and is required to protect the historical investment in the system. The data are<br />

currently accessed by over 450 District staff using the ArcGIS software, and serves as the foundation for the Water<br />

Management and Land Resources Information Systems. Additionally, the data collected by the Mapping and GIS<br />

Section are viewable and downloadable from the District's Internet web site.<br />

Costs<br />

In addition to plotting/printing supplies, office supplies and travel/training the FY20<strong>10</strong> funding include: Adminstrative<br />

Assistant Contractor ($30,633 - Governing Board), GIS Programming Contractor ($220,000 - Governing Board),<br />

Parcel Updates $48,000 - Governing Board). Funds for the GIS Programming Contractor are transferred to the<br />

Information Resources Department at the beginning of the fiscal year.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 (<strong>21</strong>7,561) 866,780 946,467<br />

0 1,595,686<br />

011 Alafia River Basin 0 0 37,509 27,245<br />

0 64,754<br />

013 Hillsborough River Basin 0 0 37,984 27,245<br />

0 65,229<br />

014 Northwest Hillsborough Basin 0 0 36,559<br />

0<br />

0 36,559<br />

015 Coastal Rivers Basin 0 0 37,509 27,245<br />

0 64,754<br />

016 Pinellas-Anclote River Basin 0 0 39,409 27,245<br />

0 66,654<br />

019 Withlacoochee River Basin 0 0 39,409 27,245<br />

0 66,654<br />

020 Peace River Basin 0 0 41,784 27,245<br />

0 69,029<br />

0<strong>21</strong> Manasota Basin 0 0 40,829 31,785<br />

0 72,614<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$2,<strong>10</strong>1,933<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 160

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!