H069<br />

PR/MRWSA Reg Loop System Ph 1A<br />

River, an approximately 2 mile segment will utilize the City of Punta Gorda's existing infrastructure. The amendment<br />

allows for the shared capacity of this segment.<br />

On May 18, 2009, the Authority held a technical coordination meeting with Charlotte County's Utilities, Public Works,<br />

and Real Estate Services departments to discuss road crossings, right of way usage, and easement acquisitions.<br />

The original Phase 1 interconnect (H050), which would run east of Phase 1A and provide rotational capacity between<br />

the two water facilities, was resubmitted for FY20<strong>10</strong> funding but was postponed again in June 2009 due to economic<br />

challenges. The project will likely be resubmitted for District funding in FY2011.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,7<strong>10</strong>,271 0 3,338 4,111<br />

0 3,717,720<br />

020 Peace River Basin 1,002,189 0 2,590 2,009<br />

0 1,006,788<br />

0<strong>21</strong> Manasota Basin 2,707,140 0 648 4,238<br />

0 2,712,026<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 5,000,000<br />

0<br />

0<br />

5,000,000<br />

Project Funds Not Budgeted by the<br />

District<br />

PRMRWSA 7,007,500 0 0<br />

0<br />

0 7,007,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$19,444,034<br />

Critical Project Milestones Projected Amended Actual<br />

Preliminary Design/Basis of Design 7/31/07 6/1/08<br />

Final Design 6/30/09<br />

Permitting / Property Aquisition 7/31/09<br />

Construction 8/1/11<br />

Contract Expires 2/1/12<br />

Status As Of: August <strong>10</strong>, 2009<br />

The Authority held a pre-qualification submittal meeting for interested contractors on August 7, 2009, and received<br />

comments from several contractors on the pre-qualification criteria. RFQs will be advertised on August 15-16, and<br />

submittals will be due by September 15. The Authority board will be asked to approve the list of pre-qualified contractors<br />

at their October 7, 2009 board meeting.<br />

Accelerate Florida Update: The Authority has been notified of the Accelerate Florida Program. Current<br />

design/permitting work is moving at an efficient pace. The Authority may consider including early completion bonuses in<br />

the construction contract. Permitting must be completed prior to construction commencement.<br />

020 - Peace River Basin <strong>21</strong>4