P = Policy (used to define an organiz<strong>at</strong>ional principle, rule, or established course of action to be<br />

followed regarding Colorado Springs Utilities)<br />

Q = Questionnaire (used <strong>for</strong> in<strong>for</strong>m<strong>at</strong>ion g<strong>at</strong>hering tools such as surveys)<br />

Record = used when a record of a process is maintained in the document binder. (Legal Hold)<br />

S = Slide (used to identify a PowerPoint slide file)<br />

T = Templ<strong>at</strong>e (used when a standard <strong>for</strong>m<strong>at</strong> is desired, but a specific field size is not practical)<br />

1.9. Review Cycle<br />

After a document has been cre<strong>at</strong>ed, it is useful to send it out <strong>for</strong> review. The review cycle is not required.<br />

At times it may be helpful to proceed directly to the Approval cycle <strong>for</strong> routine version changes of a current<br />

approved document or when the document has been reviewed by another method. The extensive review<br />

process is primarily intended <strong>for</strong> the initial release of new documents or <strong>for</strong> total rewrites of existing<br />

documents.<br />

Paper Review Cycle<br />

The review cycle can be conducted by distributing paper copies of the Parent Document and all of its<br />

<strong>at</strong>tachments to the Reviewers. Using the electronic method is preferred <strong>for</strong> tracking purposes. When th<strong>at</strong> is<br />

not feasible, this method also works well. Reviewers should include individuals or represent<strong>at</strong>ives from<br />

groups asked to per<strong>for</strong>m processes called out in the document. It is sometimes useful to also include prior<br />

Process Owners in the review process to capture historical knowledge. Each Reviewer marks up and<br />

returns feedback to the Process Owner.<br />

If the Process Owner reviews the changes and does not agree with the change recommend<strong>at</strong>ions, he/she<br />

explains to the person recommending the changes the reasons why they are not feasible.<br />

If the Process Owner agrees with the change recommend<strong>at</strong>ions, he/she incorpor<strong>at</strong>es the changes into the<br />

document.<br />

Electronic Review Cycle<br />

The Process Owner routes the process document using the Electronic Review Cycle.<br />

The Process Owner selects the “Review” option and selects individuals from the Notes directory by<br />

clicking on the twisty next to the “Reviewers” prompt in the Draft Process Documents D<strong>at</strong>abase.<br />

Reviewers should include individuals or represent<strong>at</strong>ives from groups asked to per<strong>for</strong>m processes called out<br />

in the document. It is sometimes useful to also include prior Process Owners in the review process to<br />

capture historical knowledge.<br />

Document Reviewers are autom<strong>at</strong>ically sent an e-mail message by the system, in<strong>for</strong>ming them th<strong>at</strong> a<br />

document is awaiting review and feedback. The Document Reviewer provides feedback via the Draft<br />

Process Documents D<strong>at</strong>abase. Instructions on how to track edits/comments can be found in the Process<br />

Owner Manual, I01-00002.<br />

If the Process Owner reviews the changes and does not agree with the change recommend<strong>at</strong>ions, he/she<br />

explains to the person recommending the changes the reasons why they are not feasible.<br />

The Process Owner incorpor<strong>at</strong>es changes as deemed appropri<strong>at</strong>e and proceeds to the Approval Cycle. If<br />

major changes have been recommended, the Process Owner may also elect to clear the Review Cycle and<br />

Section 6.2 may be repe<strong>at</strong>ed until the document has been fully defined and discussed.<br />

1.10. Approval Cycle<br />

Submitting a document <strong>for</strong> approval can only be conducted using an Electronic Approval Cycle.<br />

After the document has been reviewed and upd<strong>at</strong>ed, the Process Owner requests sign<strong>at</strong>ure approval by<br />

selecting the “Approval” route and listing the Document Approvers. Approvers should include the<br />

appropri<strong>at</strong>e Manager/Supervisor of the process as well as individuals or represent<strong>at</strong>ives from groups who<br />

per<strong>for</strong>m a responsibility called out in the document.<br />

At this time the Process Owner should consider who will need to be notified th<strong>at</strong> the document has been<br />

approved. This list should include users of the process, key stakeholders, and potentially affected interests.<br />

The names and/or distribution lists can be added in the field labeled “Notific<strong>at</strong>ion of Process Change.”<br />