19.11.2014 Views

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Improve Security <strong>at</strong> Crescent Hill Chlorine Building Access G<strong>at</strong>es (4 th Qtr 07)<br />

6. Installed Roll Bar on Lawn Mower (4 th Qtr 07)<br />

7. Project St<strong>at</strong>us Report Form Modific<strong>at</strong>ions (4 th Qtr 07)<br />

8. Improve Agenda Item Follow-Up <strong>for</strong> NWT Meetings (4 th Qtr 07)<br />

9. Typical Guideline <strong>for</strong> Project Manager Assistance to Right-of-Way Specialist <strong>for</strong> Property Acquisition <strong>for</strong><br />

Tank, Pump St<strong>at</strong>ion or Other Facilities (4 th Qtr 07)<br />

10. Small Contract Review and Routing Memo (4 th Qtr 07)<br />

11. Customer Survey Form Improvement (4 th Qtr 07)<br />

1 Oper<strong>at</strong>ional Improvement:<br />

1. Streamlined Pure Tap Bottling Production (4 th Qtr 07)<br />

Supporting <strong>Organiz<strong>at</strong>ional</strong> Effectiveness<br />

5 Process Improvements:<br />

1. Per<strong>for</strong>mance Evalu<strong>at</strong>ion and Per<strong>for</strong>mance Planning Quick Reference Guides - Managers & Employee<br />

Versions (1 st Qtr 07)<br />

2. Guidelines <strong>for</strong> use of Training Room A (1 st Qtr 07)<br />

3. System Certific<strong>at</strong>ion ELT Bin List Notice (2 nd Qtr 07)<br />

4. Focus Group Scope Document and Protocol Worksheet (3 rd Qtr 07)<br />

5. Sample Year-End Per<strong>for</strong>mance Partnership Reviews (4 th Qtr 07)<br />

0 Oper<strong>at</strong>ional Improvements:<br />

Managing Distribution Oper<strong>at</strong>ions<br />

12 Process Improvements:<br />

1. Trench Shield C<strong>at</strong>alog & Safe Handling Instructions (1 st Qtr 07)<br />

2. Trench Shoring <strong>for</strong> W<strong>at</strong>er Main Tees & Crosses (1 st Qtr 07)<br />

3. Two Person Service Maintenance (2 nd Qtr 07)<br />

4. Keytube Maintenance Prioritiz<strong>at</strong>ion (4 th Qtr 07)<br />

5. B62B Fire Hydrant Renov<strong>at</strong>ion Project (4 th Qtr 07)<br />

6. Low Flow Hydrant <strong>Management</strong> Process Developed (4 th Qtr 07)<br />

7. SCADA Software on MDO Engineer Computer (4 th Qtr 07)<br />

8. Allmond MDO Photo Library (4 th Qtr 07)<br />

9. Morning Report W<strong>at</strong>er Temper<strong>at</strong>ure Improvement (4 th Qtr 07)<br />

10. Spoils Agreement (4 th Qtr 07)<br />

11. Fire Hydrant Replacement Prioritiz<strong>at</strong>ion (4 th Qtr 07)<br />

12. BC Facility In-Service Memo to Allmond MDO (4 th Qtr 07)<br />

9 Oper<strong>at</strong>ional Improvements:<br />

1. Safe Working Distances/Pressurized Valves & Components (1 st Qtr 07)<br />

2. Barricade Rehabilit<strong>at</strong>ion (1 st Qtr 07)<br />

©2011 W<strong>at</strong>er Research Found<strong>at</strong>ion. ALL RIGHTS RESERVED.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!