19.11.2014 Views

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Metering Services<br />

33 Process Improvements:<br />

1. Magnetic Key Vault Lid Removal (2 nd Qtr 07)<br />

2. Delinquent Fire Service Accounts (2 nd Qtr 07)<br />

3. Disconnect Work File / Field Notices (2 nd Qtr 07)<br />

4. Bankruptcy Streamlining (2 nd Qtr 07)<br />

5. Retro-fit Advertisement in CCR (2 nd Qtr 07)<br />

6. Old Accounts to Collection Agency (Submitted first by Metering Services; Shared with IT) (4 th Qtr 07)<br />

7. COLMS – Collections Miscellaneous (4 th Qtr 07)<br />

8. New Collection Group (LARGE)/DSCN (4 th Qtr 07)<br />

9. Radio Disp<strong>at</strong>ch Support (4 th Qtr 07)<br />

10. SFOTN Improvements/Revitaliz<strong>at</strong>ion (4 th Qtr 07)<br />

11. SFO Hotline – (502) 569-3600 x SFOS (4 th Qtr 07)<br />

12. SFO Edits (4 th Qtr 07)<br />

13. AMR Drive Route Mapping (4 th Qtr 07)<br />

14. Daily Read Schedule Report (4 th Qtr 07)<br />

15. Meter Dial Reference M<strong>at</strong>erials (4 th Qtr 07)<br />

16. Rainsuit Improvements (4 th Qtr 07)<br />

17. AMR Antenna Fix (4 th Qtr 07)<br />

18. Camera Purchase (Repair Leaders) (4 th Qtr 07)<br />

19. Cross-Training Ef<strong>for</strong>t (4 th Qtr 07)<br />

20. Duty Exchange Service Order Disp<strong>at</strong>ching (4 th Qtr 07)<br />

21. Forklift Qualific<strong>at</strong>ion (4 th Qtr 07)<br />

22. Meter Inventory Tracker (4 th Qtr 07)<br />

23. Posting Productivity D<strong>at</strong>a (4 th Qtr 07)<br />

24. Pressure Testing Equipment (4 th Qtr 07)<br />

25. Use of Planner Eraser Board (4 th Qtr 07)<br />

26. RDAMR and RFFIX Field Document<strong>at</strong>ion (4 th Qtr 07)<br />

27. Tool Box Spare Keys (4 th Qtr 07)<br />

28. Meter Shop Garage Inventory Organiz<strong>at</strong>ion (4 th Qtr 07)<br />

29. Transfer of AMR MIU Number In<strong>for</strong>m<strong>at</strong>ion from C2 Personnel to Metering Services Personnel<br />

(Submitted first by Metering Services; Shared with Distribution Oper<strong>at</strong>ions) (4 th Qtr 07)<br />

30. Upd<strong>at</strong>ing ECIS When a Defective Dial is Exchanged in the Meter Shop With a New Dial Reading Zero (4 th<br />

Qtr 07)<br />

31. Groove Lock Pliers (4 th Qtr 07)<br />

32. Reading of UPS Meters (4 th Qtr 07)<br />

33. Jeep Inventory (4 th Qtr 07)<br />

4 Oper<strong>at</strong>ional Improvements:<br />

1. Meter Shop – Capitalize Labor Used Building Meter B<strong>at</strong>teries (Submitted first by Metering Services;<br />

Shared with Financial Resources) (4 th Qtr 07)<br />

2. AMR MIU Warranty (4 th Qtr 07)<br />

3. Meter Pit Extension Rings (4 th Qtr 07)<br />

4. Large Meter UME Replacement (4 th Qtr)<br />

Supplying I.T. Resources<br />

8 Process Improvements:<br />

©2011 W<strong>at</strong>er Research Found<strong>at</strong>ion. ALL RIGHTS RESERVED.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!