19.11.2014 Views

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

issue could require careful consider<strong>at</strong>ion be<strong>for</strong>e proceeding with the str<strong>at</strong>egy. Wh<strong>at</strong>ever level of<br />

technology support is needed, it is important to ensure th<strong>at</strong> the technology is selected and<br />

implemented in a manner which is cohesive with Utility needs and resources, and employee<br />

acceptance. You may wish to review the Building the Found<strong>at</strong>ion section in the Preparing<br />

phase of the toolkit process. See also Technology Rel<strong>at</strong>ed Tools in the Ideas section of the<br />

toolkit under Resources.<br />

Q38-2: Selecting level 2 indic<strong>at</strong>es th<strong>at</strong> the in<strong>for</strong>m<strong>at</strong>ion technology master plan provides some,<br />

but not necessarily sufficient, support <strong>for</strong> the KM str<strong>at</strong>egy. If the KM str<strong>at</strong>egy is highly<br />

dependent upon technological support, as many KM str<strong>at</strong>egies are, implement<strong>at</strong>ion may have to<br />

be delayed until it is assured th<strong>at</strong> adequ<strong>at</strong>e technology is available. You may wish to review the<br />

Building the Found<strong>at</strong>ion section in the Preparing phase of the toolkit process. See also<br />

Technology Rel<strong>at</strong>ed Tools in the Ideas section of the toolkit under Resources.<br />

Q38-1: Selecting level 1 indic<strong>at</strong>es th<strong>at</strong> the in<strong>for</strong>m<strong>at</strong>ion technology master plan would provide<br />

little or no technology in support of the KM str<strong>at</strong>egy. Since technology is an enabler <strong>for</strong> KM, this<br />

may not be acceptable, depending upon the needs of the KM str<strong>at</strong>egy. A careful review of the<br />

plan and the KM str<strong>at</strong>egy is necessary. You may wish to review the Building the Found<strong>at</strong>ion<br />

section in the Preparing phase of the toolkit process. See also Technology Rel<strong>at</strong>ed Tools in<br />

the Ideas section of the toolkit under Resources.<br />

Q39: How well will your in<strong>for</strong>m<strong>at</strong>ion technology department support implement<strong>at</strong>ion of<br />

a KM str<strong>at</strong>egy?<br />

Q39-3: Selecting level 3 indic<strong>at</strong>es th<strong>at</strong> the in<strong>for</strong>m<strong>at</strong>ion technology department will provide<br />

medium support to the KM str<strong>at</strong>egy. This may be s<strong>at</strong>isfactory if the KM str<strong>at</strong>egy does not<br />

require significant technology and its rel<strong>at</strong>ed support. However, if technology is a significant<br />

aspect of the KM str<strong>at</strong>egy, then a part of th<strong>at</strong> str<strong>at</strong>egy must ensure th<strong>at</strong> the in<strong>for</strong>m<strong>at</strong>ion<br />

technology department is capable of providing necessary support. You may wish to review the<br />

Building the Found<strong>at</strong>ion section in the Preparing phase of the toolkit process. See also<br />

Technology Rel<strong>at</strong>ed Tools in the Ideas section of the toolkit under Resources.<br />

Q39-2: Selecting level 2 indic<strong>at</strong>es th<strong>at</strong> the in<strong>for</strong>m<strong>at</strong>ion technology department will be able to<br />

provide some support, but perhaps not enough to ensure an effective KM str<strong>at</strong>egy. If the<br />

str<strong>at</strong>egy is dependent upon strong IT support, this issue should be resolved be<strong>for</strong>e commencing<br />

the KM str<strong>at</strong>egy. You may wish to review the Building the Found<strong>at</strong>ion section in the Preparing<br />

phase of the toolkit process. See also Technology Rel<strong>at</strong>ed Tools in the Ideas section of the<br />

toolkit under Resources.<br />

Q39-1: Selecting level 1 indic<strong>at</strong>es th<strong>at</strong> the in<strong>for</strong>m<strong>at</strong>ion technology department is essentially<br />

unable to provide support to the KM str<strong>at</strong>egy. This is only be acceptable if the KM str<strong>at</strong>egy does<br />

not include any technology <strong>for</strong> its implement<strong>at</strong>ion. However, since IT is an enabler of KM, this is<br />

highly unlikely. When technology is required, the KM str<strong>at</strong>egy would need to be delayed until<br />

this issue is resolved. You may wish to review the Building the Found<strong>at</strong>ion section in the<br />

Preparing phase of the toolkit process. See also Technology Rel<strong>at</strong>ed Tools in the Ideas<br />

section of the toolkit under Resources.<br />

Q40: The competency and skill sets of this Utility’s employees is ...<br />

Q40-3: Selecting a 3 indic<strong>at</strong>es th<strong>at</strong> the competency and skills of this Utility’s employees are<br />

average in their capacity to support a KM str<strong>at</strong>egy. This should be adequ<strong>at</strong>e to implement a KM<br />

D-27<br />

©2011 W<strong>at</strong>er Research Found<strong>at</strong>ion. ALL RIGHTS RESERVED.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!