10 | <strong>Organiz<strong>at</strong>ional</strong> <strong>Development</strong> <strong>for</strong> <strong>Knowledge</strong> <strong>Management</strong> <strong>at</strong> W<strong>at</strong>er Utilities<br />

180<br />

160<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0<br />

Interested In<br />

Planning<br />

Doing<br />

Source: Project 4003 survey process.<br />

Figure 2.1 Breakout of survey responses regarding the number of KM str<strong>at</strong>egies and<br />

initi<strong>at</strong>ives in drinking w<strong>at</strong>er utilities in terms of those underway, in the Planning stage, or<br />

those which have sparked interest<br />

development, public rel<strong>at</strong>ions, work per<strong>for</strong>mance improvement, succession and talent resource<br />

planning, work<strong>for</strong>ce planning, quality based document<strong>at</strong>ion, training, communic<strong>at</strong>ions, developing<br />

document repositories, process and oper<strong>at</strong>ional improvements, and the use of social network<br />

analysis. Table 2.1 provides the subject, estim<strong>at</strong>ed cost and benefits of each of these projects. It<br />

also includes the name of the implementing utility and the size of th<strong>at</strong> utility.<br />

When the estim<strong>at</strong>ed cost column st<strong>at</strong>es “No cost identified,” the providing utility bundled<br />

costs with the day-to-day work of the utility. In other words, this aspect of KM was recognized as<br />

the way work needed to be done and no additional specific costs were identified <strong>for</strong> implement<strong>at</strong>ion.<br />

Additional details <strong>for</strong> these studies are included as Appendix B. Each utility has also identified<br />

a point of contact <strong>for</strong> additional in<strong>for</strong>m<strong>at</strong>ion.<br />

EXTERNAL ORGANIZATIONS IMPLEMENTING KM STRATEGIES AND<br />

INITIATIVES<br />

Case Examples<br />

Twenty-one case examples were identified to provide real-life implement<strong>at</strong>ion examples of<br />

str<strong>at</strong>egies and initi<strong>at</strong>ives applied in the public, priv<strong>at</strong>e and not-<strong>for</strong>-profit sectors. Many of the initi<strong>at</strong>ives<br />

implemented in these case examples demonstr<strong>at</strong>e initi<strong>at</strong>ives included in the Tools section of<br />

the KM Toolkit (see Chapter 8 and Appendix C). While costing d<strong>at</strong>a is not available <strong>for</strong> these<br />

examples, the benefits as described by the subject organiz<strong>at</strong>ions are included in Table 2.2. More<br />

detail <strong>for</strong> each case example is included in the Resources section of the KM Toolkit under Case<br />

Examples.<br />