were scored <strong>at</strong> level 3 or higher, you will need to decide whether it is best to (a) delay starting<br />

the KM str<strong>at</strong>egy until these low-scored items are corrected, or (b) start the KM str<strong>at</strong>egy and<br />

improve these low-scored areas early during str<strong>at</strong>egy implement<strong>at</strong>ion. A third option would be<br />

to modify the KM str<strong>at</strong>egy to reduce the impact of the low-scored items. A large number of lowscored<br />

items relevant to a KM str<strong>at</strong>egy may also drive the decision not to implement th<strong>at</strong><br />

specific str<strong>at</strong>egy <strong>at</strong> this time.<br />

A next step is to individually look <strong>at</strong> all of the items shown below which were scored <strong>at</strong> levels 1,<br />

2 or 3. Next to each of the items printed below is a short discussion of th<strong>at</strong> specific item. The<br />

intent is to provide in<strong>for</strong>m<strong>at</strong>ion and suggestions to help you interpret the importance of each<br />

item to your KM str<strong>at</strong>egy, the external environment, and the internal n<strong>at</strong>ure of your Utility.<br />

[LEVEL 1, 2 AND 3 PARAS (QUESTION AND RESPONSE) INSERTED AS DETERMINED BY<br />

YOUR RESPONSES]<br />

GENERAL QUESTIONS<br />

Q1: A KM str<strong>at</strong>egy’s contribution to the current per<strong>for</strong>mance of my Utility would be ...<br />

Q1-3: Selecting level 3 indic<strong>at</strong>es th<strong>at</strong> the contribution a successful KM str<strong>at</strong>egy would provide<br />

to your utility is medium. It is likely th<strong>at</strong> more work is needed to analyze the specific str<strong>at</strong>egy to<br />

ensure increased contribution to your Utility. A discussion of “developing str<strong>at</strong>egy” is included in<br />

the Planning phase of the toolkit process.<br />

Q1-2: Selecting level 2 <strong>for</strong> this item indic<strong>at</strong>es th<strong>at</strong> you consider th<strong>at</strong> the KM str<strong>at</strong>egy would<br />

provide a low level of contribution to per<strong>for</strong>mance. This suggests th<strong>at</strong> the str<strong>at</strong>egy itself may not<br />

be applicable to your Utility <strong>at</strong> this time. Perhaps a rethinking of the specific str<strong>at</strong>egy intended<br />

would result in a higher level of contribution. A discussion of “developing str<strong>at</strong>egy” is included in<br />

the Planning phase of the toolkit process. You might consider cre<strong>at</strong>ing a team of<br />

knowledgeable leaders and managers to study the options available th<strong>at</strong> could potentially<br />

provide a higher payoff to the Utility. The MQI monogram, A Model <strong>for</strong> Team Learning and<br />

Success, is provided in the Resource Documents section of the toolkit under Resources.<br />

Q1-1: Selecting level 1 indic<strong>at</strong>es th<strong>at</strong> a KM str<strong>at</strong>egy would have little or no contribution to your<br />

organiz<strong>at</strong>ion, and there<strong>for</strong>e your Utility may not be ready to implement the KM str<strong>at</strong>egy <strong>at</strong> this<br />

time. You may want to explore the full potential of KM in terms of other str<strong>at</strong>egies or initi<strong>at</strong>ives.<br />

The Introduction and Planning phase of the toolkit process may prove useful in building and<br />

understanding KM and KM str<strong>at</strong>egies. Additionally, the Tools section of the toolkit under<br />

Resources offers an overview of KM initi<strong>at</strong>ives.<br />

Q2: A KM str<strong>at</strong>egy’s contribution to the sustainable per<strong>for</strong>mance of my Utility would be ...<br />

Q2-3: Selecting level 3 indic<strong>at</strong>es th<strong>at</strong> a successful KM str<strong>at</strong>egy would provide a medium<br />

contribution to your Utility’s sustainable per<strong>for</strong>mance. This may be acceptable if your goal is to<br />

focus on improving current per<strong>for</strong>mance. Since many KM str<strong>at</strong>egies also provide sustainable<br />

per<strong>for</strong>mance improvements, you may want to look <strong>at</strong> your KM str<strong>at</strong>egy and your Utility<br />

characteristics to see if both current and sustainable per<strong>for</strong>mance can be achieved<br />

simultaneously. The discussion on “Nurturing <strong>Organiz<strong>at</strong>ional</strong> Health” in the Sustainable phase<br />

of the toolkit may prove useful.<br />

Q2-2: Selecting level 2 indic<strong>at</strong>es th<strong>at</strong> the KM str<strong>at</strong>egy would provide little support <strong>for</strong><br />

sustainable per<strong>for</strong>mance. If this limit<strong>at</strong>ion is acceptable, you may want to proceed with<br />

D-6<br />

©2011 W<strong>at</strong>er Research Found<strong>at</strong>ion. ALL RIGHTS RESERVED.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!