19.11.2014 Views

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Certific<strong>at</strong>ion Review Process Steps:<br />

1. BSOs of systems to be reviewed are contacted in the 1 st quarter to identify timeframes to avoid<br />

based on their specific business needs.<br />

2. BSOs are in<strong>for</strong>med of their “certific<strong>at</strong>ion start d<strong>at</strong>e” <strong>for</strong> the year by the end of the 1 st quarter in<br />

order to prepare in advance.<br />

3. BSOs receive a 30-working day reminder prior to the review.<br />

4. An Entrance Conference is held with the BSO on t he “certific<strong>at</strong>ion start d<strong>at</strong>e” to review the<br />

process steps and begin the examin<strong>at</strong>ion of the system document<strong>at</strong>ion (via intranet). Documents<br />

not posted on the intranet due to confidentiality can be supplied to the review team in a binder <strong>for</strong><br />

review. The review team will protect the confidentiality of these documents and return them to<br />

the BSO as quickly as possible. ( Note: BSOs are invited to include their POs in the Entrance<br />

Conference).<br />

5. SOE reviews the system/process document<strong>at</strong>ion.<br />

6. SOE conducts personal interviews with BSO, POs and a r andom number of employees<br />

representing NWTs.<br />

7. SOE will <strong>at</strong>tend <strong>at</strong> least one NWT meeting and one SAC meeting if possible.<br />

8. SOE prepares the first draft of the certific<strong>at</strong>ion report.<br />

9. SOE conducts an Exit Conference with the BSO to review the draft report and seek clarific<strong>at</strong>ion<br />

and/or corrections on any issues.<br />

10. SOE prepares the final report and distributes same to the CBSO and BSO of the system being<br />

reviewed.<br />

11. SOE requests “management responses” to any recommend<strong>at</strong>ions be <strong>for</strong>warded to SOE within<br />

two weeks.<br />

12. CBSO schedules certific<strong>at</strong>ion discussion on ELT agenda.<br />

13. ELT reaches decision on certific<strong>at</strong>ion st<strong>at</strong>us.<br />

©2011 W<strong>at</strong>er Research Found<strong>at</strong>ion. ALL RIGHTS RESERVED.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!