19.11.2014 Views

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

Organizational Development for Knowledge Management at Water ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

KNOWLEDGE MANAGEMENT TOOLKIT<br />

[INSERT DATE TAKEN]<br />

Assessment Scoring Sheet<br />

The total score on this assessment of your drinking w<strong>at</strong>er utility is [TOTAL NUMBER IS<br />

INSERTED].<br />

As a general guideline, consider the following (with the cave<strong>at</strong>s below) be<strong>for</strong>e determining<br />

whether to initi<strong>at</strong>e a KM str<strong>at</strong>egy.<br />

(a) If your total score is 140 or gre<strong>at</strong>er, your Utility should be ready to successfully<br />

implement a KM str<strong>at</strong>egy.<br />

(b) If your total score is between 130 and 140, you may consider implementing your KM<br />

str<strong>at</strong>egy, but you may have some assessment items th<strong>at</strong> need to be fixed as part of<br />

th<strong>at</strong> str<strong>at</strong>egy.<br />

(c) If your total score is between 110 and 130, you may have to delay implement<strong>at</strong>ion of<br />

the full KM str<strong>at</strong>egy and instead select one or more initi<strong>at</strong>ives <strong>for</strong> implement<strong>at</strong>ion<br />

while fixing or upgrading those specific low-scored items needed <strong>for</strong> full KM str<strong>at</strong>egy<br />

success.<br />

(d) If your total score is under 110, low-scored items (levels 1 or 2) should be dealt with<br />

prior to implementing a KM initi<strong>at</strong>ive (or perhaps a KM str<strong>at</strong>egy if the weak areas are<br />

independent of your KM str<strong>at</strong>egy or they can be corrected).<br />

CAVEATS:<br />

While the total score is one indic<strong>at</strong>or, it is not sufficient to determine your utility’s readiness to<br />

implement a KM str<strong>at</strong>egy. Other factors th<strong>at</strong> may play a significant role in determining<br />

readiness include the specific KM str<strong>at</strong>egy being considered; the history, culture, size, vision<br />

and current situ<strong>at</strong>ion of the utility; the external environment (customers, government regul<strong>at</strong>ions,<br />

local community, Unions, political issues) within which the utility oper<strong>at</strong>es; and the n<strong>at</strong>ure and<br />

number of the items scored <strong>at</strong> level 1 or 2. For example, an item scored <strong>at</strong> level 1 or 2 could<br />

range from highly significant to irrelevant depending upon its impact on your particular KM<br />

str<strong>at</strong>egy.<br />

Shown below is a figure representing the spectrum of your assessment. The figure indic<strong>at</strong>es<br />

the number of items valued <strong>at</strong> levels 1, 2, 3, 4 and 5.<br />

[A BAR CHART IS INSERTED]<br />

This chart can be viewed from two perspectives. First, the number of items scored <strong>for</strong> a given<br />

level indic<strong>at</strong>es their potential contribution to assisting in the implement<strong>at</strong>ion of a KM str<strong>at</strong>egy.<br />

Second, note the stop-light colors <strong>at</strong>tributed to the various levels. The two right-hand columns<br />

(representing levels 4 and 5) are green, indic<strong>at</strong>ing those items fully support implement<strong>at</strong>ion of a<br />

KM str<strong>at</strong>egy. The center column (representing level 3) is yellow, indic<strong>at</strong>ing a mid-level<br />

assessment <strong>for</strong> those items and th<strong>at</strong> some caution should be maintained rel<strong>at</strong>ive to their ability<br />

to support implement<strong>at</strong>ion of a KM str<strong>at</strong>egy. The two columns on the left (representing levels 1<br />

and 2) are colored red, indic<strong>at</strong>ing th<strong>at</strong> these items provide a low or minimum contribution to a<br />

KM str<strong>at</strong>egy. These two columns also indic<strong>at</strong>e th<strong>at</strong> the items represented may need to be<br />

corrected prior to initi<strong>at</strong>ing a KM str<strong>at</strong>egy. For example, if you have two or three assessment<br />

items scored <strong>at</strong> a 1 or 2 level th<strong>at</strong> are relevant to your specific KM str<strong>at</strong>egy, yet all other items<br />

D-5<br />

©2011 W<strong>at</strong>er Research Found<strong>at</strong>ion. ALL RIGHTS RESERVED.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!