<strong>ManageEngine</strong> <strong>ServiceDesk</strong> <strong>Plus</strong> <strong>8.0</strong> :: <strong>Admin</strong> <strong>Guide</strong><br />

� Out of two tasks, if One task is complete and the other task is incomplete then the status<br />

bar would show half green color.<br />

� You will be able to view the number of tasks completed / the total number of tasks. Say<br />

1tasks completed out of 2 tasks.<br />

� You will also be able to see the Status of the task and owner at the bottom of the page. If<br />

the status is completed then the bullet point would be in green color. If the status of the<br />

task is incomplete then the bullet point would be in red color.<br />

� The calendar can show only three changes in a particular date. If there are more than three<br />

changes in a date, then the calendar will show the extra more changes in the text form as +n<br />

more as shown below.<br />

� Clicking the + n more text link, will list all the displayed changes in the calendar, plus the<br />

extra more changes in the left hand side of the page as shown below. They can also be<br />

viewed by clicking the dates of the marked changes in the calendar. Say by clicking the<br />

date you will be able to view the list.<br />

� A calendar on the top left hand side of the page, shows the current date marked in a box. All<br />

the changes in the current month will be underlined and bold. On clicking any of the<br />

underlined date will list all the scheduled change for the particular date below the calendar.<br />

� Click the Week link at the Top of the page to view the weekly change schedule as shown<br />

below. Click the forward arrow to view next week change schedules. Click the backward<br />

arrow to view the previous week change schedules.<br />