09.12.2012 Views

ManageEngine ServiceDesk Plus 8.0 :: Admin Guide

ManageEngine ServiceDesk Plus 8.0 :: Admin Guide

ManageEngine ServiceDesk Plus 8.0 :: Admin Guide

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ManageEngine</strong> <strong>ServiceDesk</strong> <strong>Plus</strong> <strong>8.0</strong> :: <strong>Admin</strong> <strong>Guide</strong><br />

In this case, the request through which the linking is done becomes the "Reference request"<br />

and other requests are its "Linked requests". This option is useful when you want to choose a<br />

specific request as the Reference request instead of the oldest created request. A relatively new<br />

request can be made as Reference request with older requests related to it as Linked requests.<br />

In the above example, linking is done through the details page of Request ID 27 and so it is<br />

made as the Reference request. Other older and newer requests (18, 25 and 28) linked to it are<br />

its Linked requests.<br />

Note: Linking requests is different from "Tasks" that are created within<br />

requests. Tasks are created in a request so that the request can be split into<br />

various activities and can be assigned to different technicians. All the tasks<br />

inside a request will be considered as a single request. However, Reference<br />

requests and the Linked requests are independent requests with only<br />

references set between them.<br />

Attributes of Reference Request and Linked Requests:<br />

1. Any Linked request can be associated with only one Reference request at any time.<br />

2. Even though Linked requests are linked to a Reference request, they will still be considered<br />

as independent requests with their own SLA, Business Rules, and so on.<br />

3. If a Reference request (A) is made as the Linked request of a new Reference request (B),<br />

then all the Linked requests earlier associated to Reference request A will be linked the new<br />

Reference request B.<br />

4. Linked requests have their own independent work logs, resolutions and notes. Operations<br />

performed over the Linked requests have no impact over the Reference request. However,<br />

any work log, resolution or note added to the Reference request can be linked to all the<br />

Linked requests by enabling corresponding check boxes.<br />

5. Notes added to a Reference request can be made available to the Linked requests by<br />

enabling the Add notes to all linked requests check box. The Discussions Notes section<br />

in the Linked request details page will show its own notes and the notes that have been linked<br />

ZOHO Corp. 86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!