All site preparation including fill placement and compaction should be observed by<br />

Kleinfelder. It is important that during the site preparation and scarification process, a<br />

representative of Kleinfelder be present to observe whether any undesirable material is<br />

encountered in the construction area and whether exposed soils are similar to those<br />

encountered during the geotechnical site exploration.<br />

8.1.3 Excavation and Backfill<br />

Excavations for footings, utility trenches, or other excavations are anticipated to be<br />

made with either a backhoe or trencher. We expect the walls of trenches less than 5<br />

feet deep to be able to stand temporarily near vertical without support. We do not<br />

anticipate excavations greater than 5 feet. If excavations greater than 5 feet are<br />

anticipated, please contact us.<br />

Where trenches or other excavations are extended deeper than 5 feet, the excavation<br />

may become unstable and should be evaluated to monitor stability prior to personnel<br />

entering the trenches. Shoring or sloping of any deep trench wall may be necessary to<br />

protect personnel and to provide stability. All trenches should conform to the current<br />

OSHA requirements for work safety. Excavations should be located so that no<br />

structures, foundations, or slabs are located above a plane projected 45 degrees<br />

upward from any point in an excavation, regardless of whether it is shored or unshored.<br />

Backfills for trenches or other small excavations beneath slabs should be compacted as<br />

noted in Table 2. Special care should be taken in the control of utility trench backfilling<br />

under structural, pavement, and slab areas. Poor compaction may cause excessive<br />

settlements resulting in damage to overlying structures and slabs.<br />

Where utility trenches extend from the exterior to the interior limits of the building,<br />

clayey soils or lean concrete should be used as backfill material for a distance of<br />

approximately 2 feet laterally on each side of the exterior building line to reduce the<br />

potential for the trench acting as a conduit for the exterior surface water. Utility trenches<br />

located in landscaped areas should also be capped with a minimum of 12 inches<br />

compacted clayey soils.<br />

94240/1(OAK8R061)/es Page 19 of 29 June 13, 2008<br />

© 2008 Kleinfelder