501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

SECTION 02239 - CEMENT MODIFICATION OF SOILS<br />

PART 1 - GENERAL<br />

1.1 Compliance with Caltrans Standard Specifications: All materials and procedures shall comply with the<br />

latest edition of the Caltrans Standard Specifications for Cement Treated Bases.<br />

1.2 Cement Factor: Owner will procure services to conduct laboratory testing prior to construction to verify<br />

properties for cement stabilization and to allow optimization of the amount of cement used to treat soil.<br />

The percentage of cement is expected to be between 4% and 8%. The exact cement content shall be that<br />

at which the mix develops a 7-day compressive strength of at least 650 psi.<br />

1.3 Testing/Test Reports: Testing and test method will be as outlined in ASTM D 2922 and ASTM D 3017.<br />

1.4 Plant, Equipment, Machines and Tools: Plant, equipment, machines and tools used in the work shall be<br />

subject to approval by Owner and shall be maintained in a satisfactory working condition at all times. The<br />

equipment shall be adequate and shall have the capability of producing the required compaction, meeting<br />

grade controls, thickness control and smoothness requirements as set forth herein.<br />

A. The machinery, tools and equipment necessary for proper execution of the work shall be on the project<br />

and approved by the Geotechnical Engineer prior to the beginning of the construction operation and shall<br />

be maintained in good working order.<br />

B. Cement shall be stored and handled in closed weatherproof containers until immediately before<br />

distribution on the sub grade.<br />

C. Cement furnished in trucks shall have the net weight of the cement certified.<br />

D. Slurry trucks may or may not have re-circulation system, and be equipped with dispersion plates or<br />

suitable means for distribution.<br />

E. Spreader bars for distributing dry cement shall be as close to the ground as practical, but in no case shall<br />

they be greater than 18 inches above the ground. Spreader bars shall be clean and in good working order<br />

so as to produce a consistent and even distribution of cement of the sub grade.<br />

1.5 Weather Limitations: Cement shall not be applied when the atmospheric temperature is less than 40<br />

degrees F or in windy conditions. No cement shall be applied to soils that are frozen or contain frost. If the<br />

temperature falls below 35 degrees F, completed cement-treated areas shall be protected against<br />

detrimental effects of freezing. Any areas of completed cement modified soil that are damaged by<br />

freezing, rainfall, or other weather conditions shall be brought to a satisfactory condition in conformance<br />

with this specification without additional cost to the Owner.<br />

1.6 Submittal: Submit Laboratory test data and proposed plan, mix, process and equipment for cement<br />

stabilization to Geotechnical Engineer and to Owner prior to construction.<br />

PART 2 - PRODUCTS<br />

CEMENT MODIFICATION OF SOILS 02239-1