501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

PART 3 - EXECUTION<br />

3.1 PIPE INSTALLATION<br />

unless otherwise superceded by a more stringent local code requirement, shall be in accordance<br />

with the Federal Energy Policy Act (EPAct) as follows:<br />

Open Enclosed<br />

HP Motors Motors<br />

1.0 82.5 82.5<br />

1.5 84.0 84.0<br />

2.0 84.0 84.0<br />

3.0 86.5 87.5<br />

5.0 87.5 87.5<br />

7.5 88.5 89.5<br />

10.0 89.5 89.5<br />

15.0 91.0 91.0<br />

20.0 91.0 91.0<br />

25.0 91.7 92.4<br />

30.0 92.4 92.4<br />

40.0 93.0 93.0<br />

50.0 93.0 93.0<br />

60.0 93.6 93.6<br />

75.0 94.1 94.1<br />

100.0 94.1 94.5<br />

150.0 94.5 95.0<br />

200.0 95.0 95.0<br />

A. Carefully follow the Drawings in laying out and installing work.<br />

B. Pipe, fitting, valves, equipment and accessories shall be carefully inspected for defects in<br />

workmanship prior to installation. Items found unsuitable, cracked, or otherwise defective shall be<br />

rejected and removed from the jobsite. Pipe, fittings, valves and equipment shall have factoryapplied<br />

markings, stampings, or nameplates with sufficient data for identification to determine their<br />

conformance with specified requirements.<br />

C. Changes in size and direction shall be made only with fittings. Long radius elbows shall be used<br />

where possible to reduce pressure drops unless otherwise specified. Pipe bends shall not be<br />

used.<br />

D. Changes in pipe size shall be made with reducer or increaser fittings to provide smooth transition.<br />

E. Sort Building: Completion of work under this Division shall require shutdown of existing systems<br />

or portions of existing systems. After installation of new work is completed, this Contractor shall<br />

restore service and put equipment (new and existing) into service and operation.<br />

F. Unless otherwise indicated, install supply piping, including shut-off valves and strainers, to coils,<br />

pumps and other equipment at line size with reduction in size being made only at inlet to<br />

equipment, control valve, or pump. Install supply piping from outlet of control valves at full size of<br />

BASIC MATERIALS AND METHODS 15050-11