501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

2. Locations of alarm-initiating and notification appliances<br />

3. Alarm control and trouble signaling equipment<br />

4. Annunciation<br />

5. Power connection<br />

6. Battery calculations<br />

7. Conductor type and sizes<br />

8. Voltage drop calculations<br />

9. Manufacturers, model numbers and listing information for equipment, devices and materials<br />

10. Details of ceiling height and construction<br />

11. The interface of fire safety control functions<br />

G. The Fire Alarm and Detection System Contractor shall consider the locations of conveyors and equipment<br />

within sort areas when determining locations of Fire Alarm and Detection System equipment. Audio/visual<br />

alarms shall not be located behind obstructions.<br />

H. Supply and install all necessary equipment, connections and labor required to interface with sprinkler<br />

monitoring system equipment, automatic suppression system(s), elevator systems, and HVAC controls.<br />

Coordinate the locations of all required interconnections with the respective trade contractors.<br />

I. Additional facility expansions are planned in the future under separate contracts. This Fire Alarm and<br />

Detection System shall be designed now to be expanded at that future time to cover the entire property, to<br />

the extent required by all applicable Codes. The existing areas or function of the property will not change<br />

substantially.<br />

J. The Division 16 Contractor shall coordinate the Fire Alarm and Detection System with the Division 15<br />

Contractor’s Fire Suppression System.<br />

K. Connect the communications cables from main fire alarm panel in the new Sort Building to the Fed Ex<br />

airport hub’s existing fire alarm system with fiber optic cable routed through the conveyor bridge to the<br />

Metroplex Building. Actual connection point in the Metroplex Building is to be determined by the<br />

contractor.<br />

L. All new Fire Alarm and Detection System and related equipment shall be FM Approved. This includes but<br />

is not limited to control panels, all detectors, waterflow alarms and tamper switches.<br />

1.2 RELATED WORK<br />

A. The Fire Alarm and Detection System for the Security Screening Building, Generator Building and<br />

Metroplex Renovations is being supplied under the scope of work of the separate contract for those<br />

buildings.<br />

1.3 SYSTEM DESCRIPTION<br />

A. Noncoded, addressable system, with multiplexed signal transmission, dedicated to fire-alarm service only.<br />