501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

H. All systems, unless noted otherwise on the drawings, shall be hydraulically calculated by the<br />

area density method unless otherwise specifically noted.<br />

I. A wet pipe system shall be provided for all areas.<br />

2.16 PIPE AND CONDUIT PENETRATIONS<br />

A. Refer to Section 15010, GENERAL PROVISIONS - MECHANICAL, and Section 15050, BASIC<br />

MATERIALS AND METHODS.<br />

B. Penetrations shall be completed in accordance with Section 15010, GENERAL PROVISIONS -<br />

MECHANICAL.<br />

2.17 IDENTIFICATION SIGNS<br />

A. All valves shall be tagged with securely attached permanent metal identification signs indicating<br />

the function of the valve and the normal position.<br />

B. Each sprinkler system shall have a securely attached permanent metal identification sign<br />

indicating the zone served, hydraulic design of the system and the available flow rates,<br />

pressures, etc.<br />

C. All information shall be permanently inscribed.<br />

D. Identification signs shall be as manufactured by Star Sprinkler <strong>Corporation</strong> (Chemetron), or<br />

equal.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION REQUIREMENTS AND APPROVALS<br />

A. Include all equipment, materials, installation, and testing in accordance with the recommendations<br />

and requirements of NFPA Standards, FM's Loss Prevention Data,<br />

including, but not limited to,<br />

8-1, 8-9 and 8-29,) the Owner's insuring agency state and local fire departments and utility<br />

company requirements.<br />

B. The Contractor shall temporarily provide personnel for a “fire watch” during shut down and<br />

modifications to any portion of the existing fire protection systems in accordance with the<br />

insurance company’s and local fire department’s requirements.<br />

C. The Contractor shall notify in writing the Owner, local fire marshal, construction manager, and<br />

Owner’s Insurance Company a minimum of five (5) days prior to commencing work on the existing<br />

fire protection system modifications.<br />

D. The drawings included with this bid package are for illustrative purposes only. The Contractor<br />

shall develop construction drawings for approval as specified.<br />

E. Coordinate sprinkler head installation with all other building components including, but not limited<br />

to, new and existing light fixtures, mechanical piping, refrigeration units, conduit, structural steel,<br />

rack components, walkways, ductwork, registers and diffusers, so that sprinkler heads are not<br />

FIRE PROTECTION 15550-8