501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

D. Frame openings with built-up joist headers consisting of joist and joist track, nesting joists, or another<br />

combination of connected joists if indicated.<br />

E. Install joist reinforcement at interior supports with single, short length of joist section located directly over<br />

interior support, with lapped joists of equal length to joist reinforcement, or as indicated on Shop Drawings.<br />

1. Install web stiffeners to transfer axial loads of walls above.<br />

F. Install bridging at intervals indicated on Shop Drawings. Fasten bridging at each joist intersection as<br />

follows:<br />

1. Bridging: Joist-track solid blocking of width and thickness indicated, secured to joist webs.<br />

G. Secure joists to load-bearing interior walls to prevent lateral movement of bottom flange.<br />

H. Install miscellaneous joist framing and connections, including web stiffeners, closure pieces, clip angles,<br />

continuous angles, hold-down angles, anchors, and fasteners, to provide a complete and stable joistframing<br />

assembly.<br />

3.6 FIELD QUALITY CONTROL<br />

A. Testing: Owner will engage a qualified independent testing and inspecting agency to perform field tests<br />

and inspections and prepare test reports.<br />

B. Field and shop welds will be subject to testing and inspecting.<br />

C. Testing agency will report test results promptly and in writing to Contractor and Architect.<br />

D. Remove and replace work where test results indicate that it does not comply with specified requirements.<br />

E. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of<br />

replaced or additional work with specified requirements.<br />

3.7 REPAIRS AND PROTECTION<br />

A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and installed coldformed<br />

metal framing with galvanized repair paint according to ASTM A 780 and manufacturer's written<br />

instructions.<br />

B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer,<br />

which ensures that cold-formed metal framing is without damage or deterioration at time of Substantial<br />

Completion.<br />

END OF SECTION 05400<br />

COLD-FORMED METAL FRAMING 05400 - 7