04.01.2013 Views

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

TranSystems Corporation - LGM Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS, GENERAL<br />

A. VOC Content: 250 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24) and<br />

complying with VOC content limits of authorities having jurisdiction.<br />

B. Low-Emitting Materials: Air barriers shall comply with the testing and product requirements of the<br />

California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions<br />

from Various Sources Using Small-Scale Environmental Chambers."<br />

2.2 PERFORMANCE REQUIREMENTS<br />

A. General: Air barrier at exterior side of exterior walls shall be capable of performing as a continuous vaporpermeable<br />

air barrier and as a liquid-water drainage plane flashed to discharge to the exterior incidental<br />

condensation or water penetration. Air-barrier assemblies shall be capable of accommodating substrate<br />

movement and of sealing substrate expansion and control joints, construction material changes,<br />

penetrations, and transitions at perimeter conditions without deterioration and air leakage exceeding<br />

specified limits.<br />

B. General: Air barrier at interior side of exterior walls and underside of roof shall be capable of performing<br />

as a continuous vapor-retarding air barrier flashed to discharge incidental condensation or water<br />

penetration. Air-Barrier assemblies shall be capable of accommodating substrate movement and of<br />

sealing substrate expansion and control joints, construction material changes, penetrations, and<br />

transitions at perimeter conditions without deterioration and air leakage exceeding specified limits.<br />

C. Air-Barrier shall conform to the requirements of the FedEx Facility Criteria Documents Manual, dated May<br />

2010 Element C30, PART 1 PERFORMANCE.<br />

1. Administrative Offices:<br />

a. Interior Wall Finishes at Exterior Walls: Maximum vapor-permeance of 1 perm when tested<br />

in accordance with ASTM E 95.<br />

b. Ceiling Finishes at Roof Level: Maximum vapor-permeance of 1 perm when tested in<br />

accordance with ASTM E 95.<br />

2.3 VAPOR-RETARDING, AIR-BARRIERS<br />

A. Provide Vapor-Retarding Air-Barriers as indicated on Drawings, Vapor-Retarding, Air-Barrier: Reinforced-<br />

Polyethylene membrane.<br />

1. Two outer layers of polyethylene film laminated to an inner reinforcing layer consisting of either<br />

nylon cord or polyester scrim and weighing not less than 25 lb/1000 sq. ft., with maximum<br />

permeance rating of 0.0507 perm. Products:<br />

a. Raven Industries Inc.; DURA-SKRIM 6WW.<br />

b. Reef Industries, Inc.; Griffolyn T-65.<br />

c. Sto Corp.; VaporSeal in two-component assembly.<br />

AIR-BARRIERS 07273 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!