501070099 Federal Express Oakland Sort Expansion Issued for Bid 10/11<br />

SECTION 01140 - WORK RESTRICTIONS<br />

1.1 GENERAL<br />

A. Sequence of <strong>Construction</strong>: Work shall be accomplished within the phases and sequences as shown on<br />

the Drawings.<br />

B. Use of Premises: Limit use of premises to work in areas indicated. Do not disturb portions of site<br />

beyond areas in which the Work is indicated.<br />

1. Owner Occupancy: Allow for uniterrupted 24-hour, 7 days a week, 52 weeks per year Owner<br />

occupancy of and use of the site.<br />

2. Contractor will expedite the work without interruptions and shall be allowed to work 7 days a<br />

week between the hours of 7:00 a.m. and 3:00 p.m. (or as otherwise approved by <strong>Construction</strong><br />

Manager) with all clean-up completed by this time. The Contractor shall complete project cleanup<br />

by 3:00 p.m. daily or by the time directed in the Contract Documents.<br />

3. Due to the location and nature of the work associated with this project, FedEx trucks and trailers,<br />

and other assorted machinery are subject to come in and out of the site at all times during<br />

construction. The Contractor shall be responsible for maintianing this level of access to vehicles<br />

at all times via Air Cargo Way and Sally Ride Way. Otherwise, the contractor shall coordinate<br />

alternative site access with the <strong>Construction</strong> Manager and shall give at least seven (7) days<br />

notice in the event that site access by Owner operated vehicles will be impacted in any way.<br />

4. Vehicular traffic in and out of the facility peaks starting at appromately 4:00 p.m. The Contractor<br />

is permitted to work beyond the 7:00 a.m. to 3:00 p.m. work window as needed provided that<br />

access is not hindered to FedEx personnel or vehicles for the duration of work.<br />

5. In the event of an emergency that may or will impact FedEx operations requiring less than the<br />

aforementioned seven days of advanced notice, contact <strong>Construction</strong> Manager.<br />

C. Maintain Owner’s Vehicle and Pedestrian Traffic Circulation: At all times during construction, Owner’s<br />

truck and vehicle traffic circulation must remain uninterrupted. During all trenching operations under<br />

travelled access routes or roadways, provide steel plate covers to assure vehicle and equipment traffic<br />

access at all times. Provide temporary walkways, barricades and safety provisions to keep Owner’s<br />

employees, visitors and other contractors on site away from open trenches and safe from construction<br />

operations.<br />

END OF SECTION 01140<br />

WORK RESTRICTIONS 01140 - 1